Pinellas County Projects
Pinellas County is always working on projects to preserve and improve infrastructure, support our economy and meet the needs of the public. Major projects are listed below, and also can be found on the Capital Improvements Project Viewer map.
Bridge Projects
Construction: In progress

Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.



Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivisionDesign: Completed
Design: In progress




Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs



Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward IslandFacility Construction
Construction: In progress




Bayside Health Clinic Expansion and Renovation Project
14808 49th Street North Clearwater, FL 33762Design: In progress
Intersection Improvements
Design: In progress




Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.Design: Not started




Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in ClearwaterParks Projects
Construction: Completed




Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains openConstruction: In progress
Design: In progress




Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683



Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.Roadway and Drainage Projects
Design: In progress




Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery BayouStudy: In progress




Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19Roadway Improvements
Construction: Not started




22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)Design: In progress




Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor



West Bay Drive Complete Streets
West Bay Drive from Belleair Bridge to intersection of Clearwater-Largo Road within the City of Belleair Bluffs and the City of Largo


