Roadway and Bridge Issues

Main Bridge

No Build Mid-Level Movable Bridge
Overall Bridge Width 40 feet, 1 inch 62 feet, 7 inches
Width of Vehicular Travel Lanes 11 feet 11 feet
Shoulders (both sides) 2 feet 8 feet
Sidewalks (north side) 3 feet, 6 inches 5 feet
Pinellas Trail Spur (south side) 6 feet 15 feet
Vertical and Horizontal Clearance 20 feet* vertical / 90 feet horizontal 35 feet vertical / 100 feet horizontal
Meets Current Design and Safety Standards No Yes
Structural Elements Corrected No Yes
Bridge Openings No change 50 percent reduction
*Does not meet United States Coast Guard vertical clearance requirements of 21 feet

Tide Relief Bridge

No Build Low-Level Fixed Bridge
Overall Bridge Width 40 feet, 1 inch 62 feet, 7 inches
Width of Vehicular Travel Lanes 11 feet 11 feet
Shoulders (both sides) 2 feet 8 feet
Sidewalks (north side) 3 feet, 6 inches 5 feet
Pinellas Trail Spur (south side) 6 feet 15 feet
Vertical and Horizontal Clearance 12.5 feet vertical / 45 feet horizontal 14.5 feet vertical / 115 feet horizontal
Meets Current Design and Safety Standards No Yes
Structural Elements Corrected No Yes
Bridge Openings N/A N/A

Social and Environmental Impacts

Main Bridge

No Build Mid-Level Movable Bridge
Private Property or Land Acquisition None None
Relocations None None
Visual Impacts None Moderate
Parks and Recreation (Temporary) None 0.92 acres
Parks and Recreation (Permanent) None Gain 0.29 acres
Historic and Archaeological Resources None None
Wetlands (Temporary) None 0.21 acres
Wetlands (Permanent) None 0.11 acres
Seagrasses (Temporary) None 0.04 acres
Seagrasses (Permanent) None None
Wildlife None Minimal
Major Utilities None None
Potential Noise Impacts (Residential) None None
Potential Noise Impacts (Recreation) None Minimal

Tidal Relief Bridge

No Build Low-Level Fixed Bridge
Private Property or Land Acquisition None None
Relocations None None
Visual Impacts None Minimal
Parks and Recreation (Temporary) None None
Parks and Recreation (Permanent) None Lose 0.51 acres
Historic and Archaeological Resources None None
Wetlands (Temporary) None None
Wetlands (Permanent) None None
Seagrasses (Temporary) None None
Seagrasses (Permanent) None None
Wildlife None Minimal
Major Utilities None None
Potential Noise Impacts (Residential) None None
Potential Noise Impacts (Recreation) None Minimal

Project Costs

Main Bridge

No Build Mid-Level Movable Bridge
Total Project Costs** (millions) N/A $77.22
**Costs include demolition, roadway and bridge construction, mobilization, maintenance of traffic, aesthetic enhancements, engineering design, construction engineering inspection (CEI) and contingency

Tidal Relief Bridge

No Build Low-Level Fixed Bridge
Total Project Costs** (millions) N/A $9.68
**Costs include demolition, roadway and bridge construction, mobilization, maintenance of traffic, aesthetic enhancements, engineering design, construction engineering inspection (CEI) and contingency

Construction Impacts

Main Bridge

No Build Mid-Level Movable Bridge
Temporary Bridge Required N/A Yes
Total Construction Time N/A 4 years ****
Anticipated Service Life 15 years 75 years
****Disruption to traffic and recreational areas is anticipated to only occur for 2.5 years

Tidal Relief Bridge

No Build Low-Level Fixed Bridge
Temporary Bridge Required N/A No ***
Total Construction Time N/A 18 months
Anticipated Service Life 15 years 75 years
***Phased construction (traffic will be maintained)