- Exterior painting when paired with:
- New or replacement siding
- Masonry work
- Remove, restore, or add architectural details or features on exterior of building
- Awnings, shutters, and canopies installation or replacement
- Flood proofing for properties in a floodplain
- Doors and windows installation or replacement (including loading dock/garage doors; costs associated with changing size of openings)
- New roof and painting for building addition
- Replacement roof for entire building when combined with a significant business expansion resulting in building addition
- Exterior lighting attached to an existing building
- New installation or replacement of exterior signage attached to the building and/or on windows (Reimbursement for signage expenses are limited to 25% of the grant award.)
- Architectural, engineering, permitting, and development review fees. (Matching reimbursement only upon completion of improvements)
|
- Stormwater improvements (improvements could include the reduction of impervious surface area such as removing unneeded pavement areas and convert to drainage areas/green space or the conversion of impervious to pervious surface(s) to better manage stormwater on property; improvements could also include green infrastructure and/or subsurface vault systems needed on-site towards stormwater management and/or treatment to comply with stormwater regulations)
- New and replacement fencing (chain link is ineligible), dumpster enclosures, and buffer walls
- Parking lots, parking spaces, service/loading areas, sidewalks, pathways, and lighting (includes ADA-compliant improvements)
- Landscaping and irrigation (no sod allowed, must be Native or “Florida-Friendly” plants and pre-approved by Pinellas County). Landscaping is limited to $2,500. This limit may be waived with County staff approval if the landscaping is integral to green infrastructure stormwater management enhancements (including but not limited to rain gardens, bio-swales, etc.)
- Construction of driveway access, pedestrian, and bicycle amenities such as benches, shelters, bike racks, and bike lockers
- New installation or replacement of exterior signage, including monument and pole signs advertising the business name and identity. (Reimbursement for signage expenses are limited to 25% of the grant award.)
- Demolition
- Sewer/Potable water utility relocation.
- Architectural, engineering, permitting, and development review fees (Matching reimbursement only upon completion of improvements)
|
- Costs associated with adding or removing walls (including costs associated with insulation, footers, load bearing walls, roofing systems, and foundations)
- Interior remodel project
- New and replacement flooring
- New ceiling installations
- New millwork and cabinetry, service counters
- Interior demolition
- Plumbing, natural gas, and electrical systems Interior painting (only when combined with a complete remodel)
- Cost associated with installation of a new restroom, if required for change of use
- Flood proofing for properties in a floodplain
- Cost to upsize an HVAC system due to significant business expansion resulting in building addition
- Remediation of environmental contamination on the interior of the building, including painting, such as lead, mold, or asbestos
- Architectural and engineering fees, as well as permitting and development review fees (Matching reimbursement only upon completion of improvements)
|
- Grease traps and/or interceptors
- Kitchen hoods and/or venting
- Plumbing/electrical
- Gas lines
- Installed Walk-ins (freezer/fridge)
- Prep space
- Permanent kitchen equipment (must include installation, excluding non-fixed equipment)
- Floor drains
- Three-compartment sink
- Flooring
- AC/heat
- Fire suppression
- Solid waste/recycling systems
- Restrooms
- ADA compliance
- Utility impact fees related to change of use to food service/grocery, or expansion/new construction of a food service/grocery business
- Other improvements (approved by the CRA) to facilitate a change of use
- Architectural and engineering fees, as well as permitting and development review fees (Matching reimbursement only upon completion of improvements)
|