53rd Avenue North Force Main Replacement
Project ID
005582A
Project Location
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.
Project Status
Construction: In progress
Project Update – March 21, 2025
In order to correct roadway unevenness, crews will be working to improve sections of 53rd Ave. N over the next couple of weeks. Emergency measures have been applied as a short-term fix, which will be modified as time allows for a more aesthetic and sustainable solution. Please adhere to posted signage during this time and use caution when driving in the area.
Project Overview
The existing sanitary sewer force main running below 53rd Avenue N. from Duhme Road to east of Seminole Boulevard is nearing the end of its operational lifespan. This project will use a combination of open trench construction and subsurface directional drilling to replace approximately 2,900 feet of the current 24-inch diameter pipe with 20-inch PVC pipe to increase durability and meet industry standards.
Project Goals
- Replace aging sanitary sewer force main
- Reduce risk of sanitary sewer main breaks and wastewater discharge
- Improve public safety
Project Location

This project is located on 53rd Avenue N from Duhme Road to the east of Seminole Boulevard in unincorporated St. Petersburg.
Project Funding
This project is funded by Pinellas County’s Sewer Renewal and Replacement Fund.
Anticipated Project Timeline
Phase | Begin | End |
Design | August 2024 | November 2024 |
Construction | December 2024 | July 2025 |
Contact Us
Shannon Ransom
Project Manager
Pinellas County Utilities
(727) 464-6861
sransom@pinellas.gov