62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
Last updated on
![62nd Avenue project area](https://pinellas.gov/wp-content/uploads/2023/09/62nd-Avenue-825x464.png)
Project ID
002180A
Project Location
62nd Avenue N., between 49th Street N. and 66th Street N.
Project Status
Design: On hold, Study: Completed
Project Overview
Pinellas County conducted a study on pedestrian and bicyclist safety improvements along 62nd Avenue N., from 49th Street to 66th Street. The study considered minor widening of the roadway to add five-foot bike lanes and/or an adjacent 12-foot shared-use path along the north side of the roadway. There is currently a five-foot-wide sidewalk along the south side of the roadway.
Project Location
![](https://pinellas.gov/wp-content/uploads/2023/03/PID-002180A_AERIAL-MAP-1024x549.jpg)
Anticipated Project Schedule
- Engineering Study: August 2022 – September 2023
- Design: Expected to begin in 2030 (To be determined)
- Construction: To be determined
Project Status
Pinellas County completed the engineering study in 2023. Design work is not expected to begin until 2030.