62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)

Project ID

002180A

Project Location

62nd Avenue N., between 49th Street N. and 66th Street N.

Project Status

Study: Completed, Design: On hold

Project Overview

Pinellas County conducted a study on pedestrian and bicyclist safety improvements along 62nd Avenue N., from 49th Street to 66th Street. The study considered minor widening of the roadway to add five-foot bike lanes and/or an adjacent 12-foot shared-use path along the north side of the roadway. There is currently a five-foot-wide sidewalk along the south side of the roadway.

Project Location

Anticipated Project Schedule

  • Engineering Study: August 2022 – September 2023
  • Design: Expected to begin in 2030 (To be determined)
  • Construction: To be determined

Project Status

Pinellas County completed the engineering study in 2023. Design work is not expected to begin until 2030.

Contact Us

John Carpenter, P.E.
Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 453-3350
jcarpent@pinellas.gov