The existing sewer main located between 96th Place and Marla Lane from the Pinellas Trail east to Ridge Road has reached the end of it’s expected lifespan. This project will use open trench construction to replace approximately 1,400 feet of the current 8-inch diameter clay pipe with 10-inch diameter PVC. This new line will also be relocated from the rear of the adjacent properties to run beneath 96th Place.

Project Goals

  • Replace aging sanitary sewer force main
  • Reduce risk of sanitary sewer main breaks and wastewater discharge
  • Improve public safety and ease of access during maintenance

Project Location

This image shows the project area with a series of lines in various colors and styles representing the current and proposed configurations of the  existing sewer line. The current position of this line is denoted in solid green, the temporary in dotted green line, and the proposed relocation in dotten black.

This project is located on 96th Place between the Pinellas Trail and Ridge Road in Seminole.

Project Funding

This project is funded by Pinellas County’s Sewer Enterprise Fund.

Anticipated Project Timeline

PhaseAnticipated StartAnticipated Completion
Bypass RelocationJanuary 15, 2025January 22, 2025
DesignDecember 2024May 2025
ConstructionJune 2025November 2025
Onsite construction will typically take place between the hours of 8 a.m. to 5 p.m. The construction schedule may vary due to unforeseen circumstances such as weather.

Contact Us

Raed Yousef
Project Manager
Pinellas County Utilities
(727) 464-5282
RYousef@pinellas.gov