Submerged Water Main Upgrade, St. Pete Beach
Project ID
006169A
Project Location
Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County
Project Status
Design: In progress
Project Overview
Pinellas County is planning to replace an aging and deteriorating 12-inch cast iron potable water pipe crossing that is currently laid on the seabed. This pipeline serves as a critical water main supply to the Vina Del Mar Neighborhood. The replacement pipe will be a 12-inch Fusible PVC or high-density polyethylene (HDPE) pipe installed via directional drilling. This replacement project aims to prevent potential pipe breaks and extend the service life of the pipeline.
Project Goals
- Replace the deteriorated 12-inch subaqueous cast iron potable water pipe crossing, to prevent failures and service interruptions.
- Use durable materials installed by directional drilling to ensure longevity and reliability.
- Extend the useful life of the water main supply line.
- Minimize uninterrupted water supply to the Vina Del Mar Neighborhood during and after construction.
Project Phases & Timeline
| Phase | Begin | End |
|---|---|---|
| Design | November 2023 | Summer 2026 |
| Construction | FY 27 Pending Funding | FY 28 Pending Funding |
*Construction duration estimated based on document details and standard timelines. Specific dates may vary depending on permitting and weather conditions.
Project Funding Source
This project is funded by Pinellas County’s Water Renewal & Replacement Fund.
Project Location
Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County