Submerged Water Main Upgrade- Madeira Beach to Treasure Island
Project ID
006167A
Project Location
29th Ave E to Key Capri, Madeira Beach to Treasure Island
Project Status
Design: Not started
Project Overview
This project aims to replace one 24-inch cast iron and one 20-inch ductile iron submerged water main between Madeira Beach and Treasure Island. These deteriorated pipes have been subject to a corrosive marine environment, and have reached the end of their service life, necessitating the installation of more durable piping.
The replacement piping will be approximately 2,000 linear feet of 30-inch DR-11 High-Density-Polyethylene (HDPE) and 2,000 linear feet of 26-inch DR11 HDPE pipes. With advanced directional drilling techniques, the new piping is projected to extend the life of the water main system, enhancing long-term reliability and performance for the community.
Project Goals
- Replace deteriorated cast iron mains with durable, corrosion-resistant materials.
- Minimize environmental and surface disruption using horizontal directional drilling.
- Extend the service life of critical underwater infrastructure.
Anticipated Project Timeline
| Phase | Anticipated Start | Anticipated End |
|---|---|---|
| Design | FY27 Pending Funding | FY28 Pending Funding |
| Construction | FY 29 Pending Funding | FY 30 Pending Funding |
*Construction duration estimated based on document details and standard timelines. Specific dates may vary depending on permitting and weather conditions.
Project Funding Source
This project is funded by Pinellas County’s Water Renewal & Replacement Fund.
Project Location
Located in 29th Ave E to Key Capri, Madeira Beach to Treasure Island