Fences & Properties

Do I need a permit for my fence?
Permit requirements for installing or replacing a fence in unincorporated Pinellas County depend on three key factors: whether the property is in a flood zone, the fence height and its construction materials.
Fences in Designated Flood Zones
If your property is in a Special Flood Hazard Area (Flood Zone), you must obtain a Floodplain Permit before installing or replacing a fence. Under Pinellas County Land Development Code (Sections 158.3 and 138.3702), floodplain reviews ensure fence installations do not endanger surrounding properties.
Fences Outside Flood Zones
Standard wood, vinyl or chain-link fences on properties outside of designated flood zones generally do not require a zoning clearance, building permit or floodplain permit. However, a Zoning Clearance is required if:
- The fence is more than 6 feet tall within your front yard setback.
- The property is a corner lot.
Work That Always Requires a Building Permit
Regardless of whether the property is within or outside a floodplain, a permit is required for:
- Fences over 6 feet tall
- Solid or mortared masonry, brick or concrete walls more than 6 feet tall
- Retaining walls and seawalls more than 2 feet tall
How to Apply
- Verify Your Flood Zone: Look up your address on the Pinellas County Flood Map.
- Submit Your Application: Create an account or log in to the Accela Public Access Portal to apply online.
- Contact BDRS: For questions, call Building & Development Review Services at (727) 464-3888 (Option 2) or email buildingpermits@pinellas.gov.