98th Way & 100th Way Drainage Improvements
Project ID
003899A
Project Location
Unincorporated County near Seminole, Bay Pines Estates neighborhood - 62nd Ave. N., 59th Ave. N. and 100th Way N.
Project Status
Design: In progress
Project Overview
The project area accommodates drainage from approximately 37 acres within the Bay Pines Estates neighborhood. Stormwater runoff drains to a County-owned pond, then to Long Bayou. The area has a history of flooding during moderate and heavy rainfall events. The existing drainage infrastructure within the project area is minimal and needs to be improved to accommodate the stormwater runoff. The proposed improvements will lessen the duration of the flooding.
Project Goals
The objectives of this project are to reduce flooding and improve water quality. Improvements to the existing stormwater system will require some roadway repairs and County-owned utility pipe replacements.
Project Location

Anticipated Schedule
- Design: Summer 2026 – Summer 2028
- Advertising & Bidding: Fall 2028 – Winter 2028
- Construction: Spring 2029 – Spring 2030
Community Outreach
A project information meeting with the community will be announced.
Project Funding
This project is supported by the Penny for Pinellas and an FDEP Resilient Florida Grant.