Community Outreach for the San Martin Blvd. Bridge Replacement Study

UPDATE
Pinellas County held a virtual project information meeting on Nov. 18, 2021, via Zoom, to share information and answer questions about the PD&E study for the San Martin Blvd. Bridge.
Overview
The project team is interested in your ideas and concerns about the project. Opportunities for community involvement will be provided throughout the study. Visit this site for up-to-date information about upcoming public meetings and for information on past meetings.
Virtual Project Information Meeting – Nov. 18, 2021
Alternative Comparison Matrix
Bridge Design
Evaluation Criteria | No Build Alternative | Preferred Alternative Right-Shifted (East) Fixed Span |
---|---|---|
Vertical Clearance over Channel | 10.5' | 19.4' |
Horizontal Clearance at Channel | 24' | 50' |
Bridge Deficiencies Addressed | No | Yes |
ADA Requirements Met | No | Yes |
Bicycles Accommodated | No | Yes |
Social and Environmental Impacts
Evaluation Criteria | No Build Alternative | Preferred Alternative Right-Shifted (East) Fixed Span |
---|---|---|
Private Property/Land Acquisition | None | None |
Seagrass/Mangrove Impacts | None | 0.02 / 0.6 acres |
Utility Impacts | None | 24" Force Main / 12" Water Main |
Offsite Detour Required | N/A | No |
Estimated Costs
Evaluation Criteria | No Build Alternative | Preferred Alternative Right-Shifted (East) Fixed Span |
---|---|---|
Design | $0 | $960K |
Construction | $0 | $13.7M |
Construction Engineering Inspection | $0 | $960K |
Preliminary Estimate of Total Cost | $0 | $15.6M |
Past Meetings
Alternatives Workshop- July 18, 2016
5-7:30 p.m.
Diffley Hall of the Holy Family Church
200 78th Ave. NE, St. Petersburg
- Comment Summary
- Comment Summary Graphic
- Fact Sheet
- Comment Form
- Presentation – Presentation – video
- 1 – Board Shift Center
- 2 – Board Shift East
- 3 – Board Shift West
- 4 – San Martin Trail Base 1
- 5 – San Martin Trail Base 2
- 6 – San Martin Trail Base 3
- 7 – Board Renderings 1
- 8 – Board Renderings 2
- 9 – Board Bridge Typical Section
- 10 – Board Typicals Trail Alignment 1
- 11 – Board Typicals Trail Alignment 2
- 12 – Board Typicals Trail Alignment 3
- 13 – Board Evaluation Matrix
- 14 – Board Existing Conditions
- 15 – San Martin Handout
Other Opportunities
Stakeholder/Small Group Meetings
If your group or organization would like the project team to make a presentation at one of your regular meetings, please contact Erin Lawson, Project Manager, Pinellas County Public Works, through the Contact Us page.
To be added to our mailing list, visit the Contact Us page on this site and email us your contact information.