Dolphin Boulevard Seawall Replacement

Project ID

90019C1-14

Project Location

Dolphin Blvd. S.

Project Status

Design: In progress

Project Overview

The objective of this project is to replace the seawall located along Dolphin Boulevard S. in Gulfport that failed and caused the roadway to collapse after the storm surge from the hurricanes in 2024. The project consists of seawall replacement and rehabilitation of the sidewalks, roadways, curbs, guardrail, and County-owned utilities. Replacement of the existing concrete panel seawall with a steel sheet pile seawall is planned.

Project Location

Map showing the location of the project along Dolphin Boulevard

Anticipated Schedule

  • Design: Late 2025 – Late 2026
  • Construction: Spring 2027 – Fall 2028

Community Outreach

A project information meeting is planned to be scheduled ahead of construction.

Nov. 4, 2026: Early Notice and Public Review of a Proposed Activity in a Floodplain and Wetland

Persons with disabilities may contact our Office of Human Rights by calling (727) 464-4880 or by email for additional assistance with these documents.

Project Funding

This project is supported by Federal Emergency Management Agency funding.

Contact Us

Kameron Thomas-Gonzalez
Project Manager
Public Works / Capital Improvement
14 S. Fort Harrison Ave., Clearwater, FL 33756
(727) 464-3406
kthomasgonzalez@pinellas.gov