Highland/McMath Force Main Replacement

Project ID

003761A

Project Location

Highland Lakes Community and McMath Road in Palm Harbor

Project Status

Design: Not started

Project Overview

The Highland/McMath force main project proposes to construct over 5 miles of new 24-inch sewer force main near and through the Highland Lakes community area as the existing force mains are nearing the end of their useful life. With this new construction, we will use existing easements behind homes to align the new main with more accessible right-of-way areas, which will improve access for future maintenance.

Phase I

The first phase of this project will focus on the McMath Drive force main from Pump Station 355. The new main, which will be about 4,000 feet long, will be moved south to Tampa Road and connect to the existing pipe that leaves Pump Station 450.

Phase II

The second phase of this project will move about 26,000 feet of 20-inch pipe to run along Ridge Blvd, Camelot Court and several easements in the Highland Lakes and Alderman Road area, continuing west on Bee Pond Road to Pump Station 302.

Anticipated Timeline

Phase I

Project PhaseStartEnd
DesignJune 2026April 2027
ConstructionJanuary 2028January 2030

Phase II

Timeline will be determined pending project funding.