Lake Seminole Weir Replacement
Project ID
90018D3
Project Location
The south end of Lake Seminole, adjacent to Park Blvd.
Project Status
Design: In progress
Project Overview
The original weir structure for Lake Seminole was irreparably damaged during Hurricane Helene in September 2024. This event significantly reduced the water level in Lake Seminole. Pinellas County started the emergency repair in October 2024 using temporary steel sheet piles to restore the lake’s function while a permanent solution was designed and implemented.
Project Location

Anticipated Schedule
- Design: Spring 2026 – Spring 2028
- Construction: Spring 2028 – Fall 2028
Community Outreach
A project information meeting will be scheduled with the community before the completion of the design phase.
Project Funding
This project is supported by a grant from the Federal Emergency Management Agency’s Hurricane Helene Public Assistance program, State grant funding and the Penny for Pinellas.