Mehlenbacher Road Sidewalk Improvements
Project ID
001976A
Project Location
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Project Status
Construction: Completed
Project Overview
Pinellas County proposed sidewalk and drainage improvements on Mehlenbacher Road. The project consisted of ADA-compliant sidewalks, curb ramps and driveways, along with drainage improvements to reduce flooding and inflow into the sewer system.
The sidewalk and drainage improvements on the north side of Mehlenbacher Road are from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive. ADA-compliant sidewalk, curb ramps and driveways were constructed at the intersection of Indian Rocks Road and Mehlenbacher Road.
Mehlenbacher Road was milled and resurfaced from Indian Rocks Road to just west of Clearwater-Largo Road after the sidewalk construction was completed.
Project Location
Project Timeline
- Design: Winter 2017 – Winter 2022
- Construction: July 2023 – June 2024
Community Outreach
- Dec. 10, 2018: Pinellas County held a Project Information meeting at the Belleair Town Hall to provide information about the proposed sidewalk improvements and to answer questions.
Contact Us
John Carpenter, P.E.
Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 453-3350
jcarpent@pinellas.gov