Project Status
Construction: Not started
Project Overview
This project is to remove and replace stormwater structures and pipes that needed repair and to restore the roadway.
The location of construction will be along Tarpon Wood Boulevard between Oak Ridge Drive and Bridlewood Boulevard. Tarpon Woods Boulevard between these two construction areas and Bridlewood Boulevard will be closed. Bridlewood Boulevard and the middle entrance of Josie Lane will not be accessible from Tarpon Woods Boulevard.
Residents north of the project limits can use Ridgemoor Boulevard to access East Lake Road. Residents south of the project can use Tarpon Woods Boulevard to access East Lake Road.
Project Location

Anticipated Schedule
- Construction: September 21 – October 18, 2026 (weather permitting)
Community Outreach
Preconstruction letters are being sent to affected property owners ahead of construction.
Project Funding
This projected is supported by the Penny for Pinellas.
Contact Us
Cally Wharry
Construction Project Manager
Public Works / Construction
22211 US Hwy 19 N., Clearwater, FL 33765
(727) 464-8886
cwharry@pinellas.gov
Travis Gennell
Design Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 464-3486
tgennell@pinellas.gov