Taylor Lake Seawall Improvements
Project ID
002228A
Project Location
1100 8th Ave. SW, Largo, Florida 33770
Project Status
Construction: Completed
Project Overview
This project consists of the replacement of the existing vinyl sheet pile wall along the north end of Taylor Lake, drainage improvements along 8th Avenue SW, and repair of the existing pedestrian bridge that joins the sidewalk running along 8th Avenue SW.
New drainage structures with a curb and gutter system will be installed on the south side of 8th Avenue SW, and all existing closed-flume inlets on the north side will be replaced with curb inlets to minimize erosion. The existing sidewalk on the south side of 8th Avenue SW will be widened and the section of 8th Avenue SW from approximately the pedestrian crosswalk to the main park entrance will be repaved.
The water elevation of the lake needed to be lowered for the contractor to replace the existing sheet pile wall and repair the existing weir structure. The lake water elevation was kept lower for most of the construction phase.
Project Location
Project Timeline
Design Complete: December 2022
Construction: September 2023 – Fall 2024
Community Outreach
The latest project updates can be found on this page.
Project Funding
This project is supported by the Penny for Pinellas.
Contact Us
Rob Meador, P.E.
Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 464-8731
rmeador@pinellas.gov