Project Status
Design: In progress
Project Overview
Pinellas County proposes improvements along West Bay Drive within the City of Belleair Bluffs and City of Largo. The project begins at Belleair Bridge in Belleair Bluffs and continues east for approximately 1.9 miles to the intersection of Clearwater-Largo Road in Largo.
Throughout the project limits, West Bay Drive extends through a mix of residential and suburban commercial neighborhoods. The intent of this project is to mill, resurface and restripe the pavement, add landscaped medians and construct a 10-foot-wide sidewalk on the south side to improve pedestrian safety and connectivity for residential areas and local businesses to the Pinellas Trail.
NOTE: Most project improvements are located within the City of Largo. Project work within the City of Belleair Bluffs will be limited to roadway resurfacing. At least one lane of through traffic in each direction is expected to be maintained at all times.
Anticipated Project Timeline
Design: Spring 2022 – Early 2025
Construction: Summer 2025 – Late 2026
Community Outreach
May 30, 2024: Pinellas County hosted two identical virtual Project Information meetings, one in the morning and one in the evening, to review the proposed improvements and answer questions from the community. Watch the morning session below.
Project Engineering Plans (Not Final)
Contact Us
Ann Venables, AICP, ENV-SP
Project Manager
Public Works / Capital Improvements
14 S. Fort Harrison Ave., Clearwater, FL 33756
(727) 464-3640
avenables@pinellas.gov