Community Outreach for East Lake Road Corridor
Information about Project Information Meetings that will held during the PD&E study will be posted here.
Past Meetings
In-Person Open House – June 1, 2022
- East Lake Road Corridor Study – Existing Roadway
- East Lake Road Corridor Study – Traffic Projections
- EXAMPLE: East Lake Road Six Lane Widening
- EXAMPLE: East Lake Widening – Curlew Road-John Chesnut
- EXAMPLE: East Lake Widening – John Chesnut- Arbor Oaks Drive
- EXAMPLE: East Lake Widening – Pine Ridge Blvd-Trinity Blvd
- EXAMPLE: Innovative Intersection-DLT-Curlew Road
- EXAMPLE: Innovative Intersection-DLT-Keystone Road
- EXAMPLE: Innovative Intersection-DLT-Woodlands Blvd
- EXAMPLE: Innovative Intersection-MUT-Ridgemoor Blvd
- EXAMPLE: Innovative Intersection-RCUT-Lansbrook Parkway
- EXAMPLE: Innovative Intersection-RCUT-Pine Ridge Blvd
- EXAMPLE: Innovative Intersection-RCUT-Tampa Road
Please contact our Office of Human Rights at (727) 464-4880 or accommodations@pinellas.gov if you require additional assistance with these documents.
Virtual Project Information Meeting – May 18, 2022
East Lake Road Corridor Study Virtual Meeting Recording (approx. 1 hour, 33 minutes)
East Lake Road Corridor Study Presentation Video (approx. 14 minutes)
Innovative Intersections Explained by Virginia DOT (approx. 8 minutes)