Lake Saint George Drive Culvert Replacement

Project ID

90019Y4

Project Location

Lake St. George Drive, south of Cloverplace Dr.

Project Status

Design: In progress

Project Overview

This project replaces the existing triple 48-inch concrete culverts crossing under Lake St. George Drive, between Longleaf Lane and Cloverplace Drive. The existing 48-inch culverts and end walls were damaged during the hurricanes of 2024.

The damaged pipes will be replaced with a new 10’ x 7’ concrete box culvert with headwalls. Minor upstream and downstream channel improvements will provide a hardened system that is less susceptible to impacts from extreme weather events. The project includes associated roadway, curb, sidewalk and driveway restoration. This is a Federal Highway Administration Emergency Relief Program project.

Project Location

Map of project area along Forest Lake Blvd.

Anticipated Schedule

  • Design: Summer 2026 – Fall 2027
  • Construction: Spring 2028 – Late 2028

Community Outreach

A project information meeting is planned to be scheduled ahead of construction.

Project Funding

This project is supported by funding from the Federal Highway Administration and the Penny for Pinellas.

Contact Us

Marina Abdel Malek
Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 464-8958