Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Project ID

000967C

Project Location

Pinellas Trail, over the Lake Tarpon outfall canal

Project Status

Construction: Completed

Project Description

Project complete. The project generally consisted of a paved 12-foot-wide surface with 2-foot-wide unpaved shoulders on both sides. However, in a few areas, the trail width transitions to an 8-foot paved surface due to property restrictions. The trail was designed and constructed to meet all federal and state Americans with Disabilities Act (ADA) and safety standards.

Project Location

Project Timeline

  • Construction: March 2024 – July 2025

Project Funding

This project was supported by:

  • The Penny for Pinellas
  • Federal award number SLFRP4653 awarded to Pinellas County Government by the U.S. Department of the Treasury