Republic Drive Culvert Replacement
Project ID
90019Y5
Project Location
Republic Drive, between Fairfield Ct. and US Hwy 19
Project Status
Design: In progress
Project Overview
This project replaces the existing double 72-inch concrete culverts crossing under Republic Drive, between Fairfield Ct and US Highway 19 N. The existing culverts and end walls were damaged during Hurricane Milton. The damaged pipes will be replaced in kind. The project will provide a hardened system that is less susceptible to impacts from future extreme weather events. The project includes associated roadway, curb, and sidewalk restoration.
This is a Federal Highway Administration Emergency Relief Program project.
Project Location

Anticipated Schedule
- Design: Summer 2026 – Late 2026
- Construction: Spring 2027 – Summer 2028
Community Outreach
A project information meeting is planned to be scheduled ahead of construction.
Project Funding
This project is supported by a grant from the Federal Highway Administration, administered by the Florida Department of Transportation.
Contact Us
Michael O’Connor
Project Manager
Public Works / Capital Improvements
14 S. Ft. Harrison Ave., Clearwater, FL 33756
(727) 464-8891
moconnor@pinellas.gov