Inspections

Homeowners and contractors can schedule inspections of their property through Pinellas County’s Building and Development Resources.

Search Criteria

Please choose from the fields below to fine tune the results shown.

Keyword Search

Topics

Government Offices

Boards, Councils, and Committees

Location

Offline Field Report Inspection Instructions (Monument, Pylon, Pole Signs – With Electrical

Please complete all steps listed in the Offline Report Inspection Instructions form, then complete the Wire Size Affidavit (required for all virtual electric......

Page

Offline Field Report Inspection Instructions (Wall Sign – No Electrical)

Please complete all steps listed in the Offline Report Inspection Instructions form, then complete the Wire Size Affidavit on this page. Upload all......

Page

Offline Field Reports: Forms & Instructions

Pinellas County offers Virtual Inspections for the Express Permit types listed below. Click on a permit type to view, download, and complete......

Page

Offline Field Report Inspection Instructions (A/C Duct Replacement)

Please complete all steps listed in the Offline Report Inspection Instructions form, then complete the Wire Size/Heat Shield Affidavit. Visit our Virtual......

Page

Offline Field Report Inspection Instructions (A/C Changeout – With Duct, No Electric)

Please complete all steps listed in the Offline Report Inspection Instructions and complete the Wire Size/Heat Shield Affidavit. Visit our Virtual Inspections......

Page

Offline Field Report Inspection Instructions (A/C Changeout – With Electric)

Please complete all steps listed in the Offline Report Inspection Instructions form listed below and complete the Wire Size/Heat Shield Affidavit (required for all......

Page

Offline Field Report Inspection Instructions (A/C Equal Changeout – No Gas, Oil or Electric)

Please complete all steps listed in the Offline Report Inspection Instructions form and complete the Wire Size/Heat Shield Affidavit (required for all mechanical virtual......

Page

Offline Field Report Inspection Instructions (2 A/C Changeout – No Gas, Oil or Electric)

Please complete all steps listed in the Offline Report Inspection Instructions form listed below and complete the Wire Size/Heat Shield Affidavit (required for......

Page

Offline Field Report Inspection Instructions (Reroof Tile)

Please complete all steps listed in the Offline Report Inspection Instructions form. Visit our Virtual Inspections Page for more information....

Page

Offline Field Report Inspection Instructions (Reroof Shingle and/or Flat)

Please complete all steps listed in the Offline Report Inspection Instructions form. Visit our Virtual Inspections Page for more information....

Page