Transportation

Pinellas County’s Intelligent Transportation System integrates a network of smart technology and devices to enhance mobility for all road users and improve traffic flow.

Dunedin Causeway Bridges Project

Project Overview Pinellas County, in conjunction with FDOT, conducted a PD&E Study to evaluate options for rehabilitation or replacement of the Dunedin…

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Project Description There is one remaining gap in the northern segment of the Pinellas Trail, referred to as the Pinellas Trail North…

Westwinds and Crosswinds Bridges Project

Project Overview Pinellas County replaced the Westwinds and Crosswinds Bridges as part of its ongoing effort to maintain and operate the network…

West Bay Drive Improvements

Project Overview Pinellas County proposes improvements along West Bay Drive within the City of Belleair Bluffs and City of Largo. The project…

Move Safe Pinellas

Move Safe, Pinellas enhances bicyclist and pedestrian safety to reduce related crashes and fatalities in Pinellas County. Since 2018, the award-winning safety…

Pavement Preservation & MSTU Road Paving Programs

Pavement Preservation Overview Pavement preservation is completed to protect the base material of our roads and minimize pavement issues, such as potholes…

Search Criteria

Please choose from the fields below to fine tune the results shown.

Keyword Search

Topics

Information Type

Government Offices

Boards, Councils, and Committees

Location

Dunedin Causeway Bridges Main Bridge Preferred Alternative Mid-Level

Image showing Dunedin Causeway Bridges main bridge preferred alternative - a mid-level movable bridge....

Page

Board Typicals Trail Alternative 3 Hybrid Alignment Bridge Graphic

Graphic showing the third alternative for the San Martin Boulevard over Riviera Bay Bridge Replacement Project....

Page

Board Typicals Trail Alternative 2 East Alignment Bridge Graphic

Graphic showing the second alternative for the San Martin Boulevard over Riviera Bay Bridge Replacement Project....

Page

Board Typicals Trail Alternative 1 West Alignment Bridge Graphic

Graphics showing the first trail alternative for the San Martin Boulevard over Riviera Bay Bridge with a left - or west - alignment....

Page

Beckett Bridge Welcome for Public Hearing

Welcome document introducing the Beckett Bridge Project Development and Environmental Study hearing....

Page

Beckett Bridge Rehabilitation Alternative 2

Document detailing the second Beckett Bridge Rehabilitation alternative that doesn't include bridge widening....

Page

Beckett Bridge Rehabilitation Alternative 1

Mockups showing the no widening rehabilitation alternative for the Beckett Bridge Project Development and Environmental Study....

Page

Beckett Bridge Proposed Roadway Sections Graphics

Graphics showing a comparison between the existing east and west roadways and the recommended alternative roadways for the new movable Beckett Bridge....

Page

Beckett Bridge Preservation Section 106 Mitigation Options

Document showing the options proposed to mitigate and abide by Section 106 requirements to preserve the Beckett Bridge. ...

Page

Beckett Bridge Potential Impacts Docks at Yacht Club

Document describing the potential impacts the docks at the Yacht Club may experience as part of the Beckett Bridge Project Development and Environmental Study. ...

Page