Transportation

Pinellas County’s Intelligent Transportation System integrates a network of smart technology and devices to enhance mobility for all road users and improve traffic flow.

Dunedin Causeway Bridges Project

Project Overview Pinellas County, in conjunction with FDOT, conducted a PD&E Study to evaluate options for rehabilitation or replacement of the Dunedin…

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Project Description There is one remaining gap in the northern segment of the Pinellas Trail, referred to as the Pinellas Trail North…

Westwinds and Crosswinds Bridges Project

Project Overview Pinellas County replaced the Westwinds and Crosswinds Bridges as part of its ongoing effort to maintain and operate the network…

West Bay Drive Improvements

Project Overview Pinellas County proposes improvements along West Bay Drive within the City of Belleair Bluffs and City of Largo. The project…

Move Safe Pinellas

Move Safe, Pinellas enhances bicyclist and pedestrian safety to reduce related crashes and fatalities in Pinellas County. Since 2018, the award-winning safety…

Pavement Preservation & MSTU Road Paving Programs

Pavement Preservation Overview Pavement preservation is completed to protect the base material of our roads and minimize pavement issues, such as potholes…

Search Criteria

Please choose from the fields below to fine tune the results shown.

Keyword Search

Topics

Information Type

Government Offices

Boards, Councils, and Committees

Location

Beckett Bridge Conditions of the Memorandum of Agreement

The Section 106 Documents, which address the impacts to the historic bridge and proposed mitigation, have been approved. On February 2, 2015,......

Page

Beckett Bridge Aesthetics Committee Report

As specified in the Section 106 Memorandum of Agreement (MOA), Pinellas County created an Aesthetics Committee consisting of representatives from the local......

Page

Westwinds and Crosswinds Bridges Project

Project Overview Pinellas County replaced the Westwinds and Crosswinds Bridges as part of its ongoing effort to maintain and operate the network......

Project

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Project Description There is one remaining gap in the northern segment of the Pinellas Trail, referred to as the Pinellas Trail North......

Project

San Martin Boulevard Bridge Replacement

Pinellas County is designing a new bridge to replace the existing San Martin Boulevard Bridge. The existing bridge will be replaced with......

Project

Crystal Beach Drainage and Roadway Improvements

Project Overview The Crystal Beach Drainage and Roadway Improvements project limits are generally from Crystal Beach Avenue to Florida Boulevard and extend......

Project

Dunedin Causeway Bridges Project

Project Overview Pinellas County, in conjunction with FDOT, conducted a PD&E Study to evaluate options for rehabilitation or replacement of the Dunedin......

Project

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study

Project Overview Pinellas County is working with the Florida Department of Transportation (FDOT), the City of Clearwater, and Forward Pinellas on the......

Project

Beckett Bridge Replacement Project

Project Overview Pinellas County conducted a Project Development and Environment (PD&E) Study to evaluate the removal, rehabilitation or replacement of the existing......

Project

Move Safe Pinellas

Move Safe, Pinellas enhances bicyclist and pedestrian safety to reduce related crashes and fatalities in Pinellas County. Since 2018, the award-winning safety......

Program