East Lake Road/Tarpon Woods Boulevard Intersection Lane Extension

Project Overview

The overall project consists of adding an additional northbound travel lane on East Lake Road, beginning south of the intersection of Tarpon Woods Boulevard and extending north through the intersection. The existing roadway has two northbound travel lanes and dedicated turning lanes on the east and west. The posted speed limit is 50 mph.

The project will turn the chevron-striped area (next to the westbound turn lane) and into a travel lane, and the intersection will be repaved and restriped.

Additionally, the concrete island on the east side of the intersection will be removed, and the median on Tarpon Woods Boulevard will be shortened to create a new crosswalk. The dedicated eastbound turn lane onto Tarpon Woods Boulevard will remain.

Project Location

Anticipated Schedule

  • Construction: Early April 2026 – Late April 2026

Project Funding

This project is supported by the Penny for Pinellas.