Transportation Planning

Pinellas County is working to be on the forefront of transportation planning to create safe routes for commuters across the county and provide options for transportation.

Search Criteria

Please choose from the fields below to fine tune the results shown.

Keyword Search

Topics

Information Type

Government Offices

Boards, Councils, and Committees

Location

San Martin Blvd PD&E Study Left Shifted West Alternative Graphic

Graphic of the left-shifted (west) bridge alternative for the San Martin Boulevard over Riviera Bay PD&E study. Graphic includes design and traffic notes, and height gradients. ...

Page

San Martin Blvd PD&E Study Existing Conditions and Images

Documentation of the current obsolete conditions of the San Martin Boulevard bridge over Riviera Bay. Issues include narrow sidewalks and shoulders, lack of bike lanes, substandard railings and more. ...

Page

San Martin Blvd PD&E Study Centered Alternative Graphic

Rendering of the centered route alternative for the San Martin Boulevard bridge over Riviera Bay. Rendering includes design and traffic notes, and vertical gradient measurements....

Page

San Martin Blvd PD&E Study Bridge Typical Section Graphic

Rendering of a typical cross-section of the proposed bridge for San Martin Boulevard over Riviera Bay. Graphic includes measurements for sidewalks, bike lanes, traffic lanes and shared paths. ...

Page

San Martin Blvd PD&E Study Bridge Renderings

An additional rendering of different perspectives of the centered bridge alignment option of the San Martin over Riviera Bay PD&E study. ...

Page

San Martin Blvd PD&E Study Bridge Perspective Renderings

Renderings of different perspectives of the centered bridge alignment option of the San Martin Boulevard over Riviera Bay PD&E study. ...

Page

San Martin Blvd PD&E Study Alternatives Comparison Matrix

Chart that compares all of the bridge route alternatives from the San Martin Boulevard over Riviera Bay PD&E study. This includes left-shifted, centered, right-shifted and no-build options. ...

Page

Roadway and Related Construction Standard Details Nov 2016

November 2016 standard details and guidelines for roadways, driveways, pavement, sidewalks, drainage and other related construction matters in Pinellas County. ...

Page

Public Hearing Clarification Letter to Prior Correspondence

Clarification on prior Pinellas County correspondence about the 2014 public hearing scheduled for the Becket Bridge PD&E Study. ...

Page

Public Alternatives Workshop for San Martin Blvd Meeting Summary

Explanation of the results of the public feedback from a 2016 alternatives workshop for the San Martin Boulevard over Riviera Bay PD&E Study. ...

Page