Transportation

Pinellas County’s Intelligent Transportation System integrates a network of smart technology and devices to enhance mobility for all road users and improve traffic flow.

July 24, 2024

Technical Coordinating Committee (TCC) Meeting – Canceled

More information about Forward Pinellas Technical Coordinating Committee is available here: https://forwardpinellas.org/advisory-committees/technical-coordinating-committee/ Appeals: Certain public meetings result in actions taken by the…

310 Court Street, Lg Conference Room , 1st floor
July 25, 2024

Citizens Advisory Committee (CAC ) Meeting – canceled

More information about Forward Pinellas Citizens Advisory Committee is available here: https://forwardpinellas.org/advisory-committees/citizens-advisory-council-cac/ Appeals: Certain public meetings result in actions taken by the…

310 Court Street, Lg Conference Room , 1st floor
August 14, 2024

Forward Pinellas Board Meeting – Canceled

Contact: Maria Kelly mkelly@forwardpinellas.org View the Agenda The Forward Pinellas Board meeting will be held in The Palm Room at 333 Chestnut…

Pinellas County Communications – Palm Room
August 19, 2024

Bicycle Pedestrian Advisory Committee (BPAC) Meeting

More information about Forward Pinellas Bicycle Pedestrian Advisory Committee is available here: https://forwardpinellas.org/advisory-committees/bicycle-pedestrian-advisory-committee/ Appeals: Certain public meetings result in actions taken by…

310 Court Street, Lg Conference Room , 1st floor

Dunedin Causeway Bridges Project

Project Overview Pinellas County, in conjunction with FDOT, conducted a PD&E Study to evaluate options for rehabilitation or replacement of the Dunedin…

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Project Description There is one remaining gap in the northern segment of the Pinellas Trail, referred to as the Pinellas Trail North…

Westwinds and Crosswinds Bridges Project

Project Overview Pinellas County is replacing the Westwinds and Crosswinds Bridges as part of its ongoing effort to maintain and operate the…

West Bay Drive Improvements

Project Overview Pinellas County proposes improvements along West Bay Drive within the City of Belleair Bluffs and City of Largo. The project…

Move Safe Pinellas

Move Safe, Pinellas enhances bicyclist and pedestrian safety to reduce related crashes and fatalities in Pinellas County. Since 2018, the award-winning safety…

Pavement Preservation & MSTU Road Paving Programs

Pavement Preservation Overview Pavement preservation is completed to protect the base material of our roads and minimize pavement issues, such as potholes…

Search Criteria

Please choose from the fields below to fine tune the results shown.

Keyword Search

Topics

Information Type

Government Offices

Boards, Councils, and Committees

Location

Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)

Project Overview Pinellas County completed a Preliminary Engineering Report on the widening of Forest Lakes Boulevard from SR-580 to Tampa Road in......

Project

Riviere Road Roadway Improvements

Project Overview This project proposes roadway, drainage and sidewalk improvements along Riviere Road in Palm Harbor. The project begins at Tampa Road......

Project

East Lake Road Corridor Study – Innovative Intersection (RCUT) at McMullen Booth Road and Tampa Road

Innovative Intersection Restricted Crossing U-Turn at McMullen Booth Road and Tampa Road for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (RCUT) at Ridgeline Blvd./Pine Ridge Blvd.

Innovative Intersection Restricted Crossing U-Turn at East Lake Road and Ridgeline Blvd./Pine Ridge Blvd. for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (RCUT) at Lansbrook Parkway/Cypress Woods Blvd.

Innovative Intersection Restricted Crossing U-Turn at East Lake Road and Lansbrook Parkway/Cypress Woods Blvd. for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (MUT) at East Lake Road and Village Center Drive/Ridgemoor Blvd.

Innovative Intersection Median U-Turn (MUT) at East Lake Road and Village Center Drive/Ridgemoor Blvd. for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (DLT) at East Lake Road and Boot Ranch Blvd./Woodlands Blvd.

Innovative Intersection Displaced Left Turn (DLT) at East Lake Road and Boot Ranch Blvd./Woodlands Blvd. for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (DLT) at East Lake Road and Keystone Road

Innovative Intersection Displaced Left Turn (DLT) at East Lake Road and Keystone Road for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Innovative Intersection (DLT) at McMullen Booth Road and Curlew Road

Innovative Intersection Displaced Left Turn (DLT) at McMullen Booth Road and Curlew Road for the East Lake Road Corridor Study...

Page

East Lake Road Corridor Study – Pine Ridge Blvd. to Trinity Blvd.

Six Lane Roadway Widening from Pine Ridge Blvd. to Trinity Blvd. for the East Lake Road Corridor Study...

Page