Pinellas County Projects

Pinellas County is always working on projects to preserve and improve infrastructure, support our economy and meet the needs of the public. Major projects are listed below. See projects on a map.

Beach and Coastal Projects

Construction: Completed

Aerial view of Grand Canal/Dents Channel

Grand Canal (Dents Channel) Dredging

Dents Channel in Tierra Verde
Aerial image of Pass-a-Grill Beach

Pass-a-Grille Beach Nourishment

Pass-a-Grille Beach
Madeira Beach Access photo of damaged area

Madeira Beach Access Parking Area

14400 Gulf Blvd, Madeira Beach, FL 33708

Construction: In progress

Sand Key beach showing the increased expanse of sand between beach that has been renourished and beach that has not.

2025 Pinellas County Beach Nourishment Project

The island of Sand Key, Treasure Island and Upham Beach.

Bridge Projects

Construction: Completed

Westwinds and Crosswinds bridges in Palm Harbor, Florida

Westwinds and Crosswinds Bridges Project

Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.
Penny For Pinellas Project
A picture of the newly paved road approaching the new bridge on Old Coachman Road. The road curves to the left to the new bridge, and there are piles of dirt, construction barriers and construction equipment.

Old Coachman Road Bridge Replacement

Old Coachman Road, north of Sharkey Road
Penny For Pinellas Project

Construction: In progress

replacement bridge on Oakwood Drive in Pinellas County

Oakwood Drive Bridge Replacement

Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivision
Penny For Pinellas Project

Construction: Not started

A picture of the old 13th street bridge

13th Street/Sands Point Drive Bridge Replacement

13th Street S., near 3rd Avenue S. in Tierra Verde
Penny For Pinellas Project
Madonna Boulevard Bridge in Tierra Verde

Madonna Boulevard Bridge Replacement

Madonna Boulevard in Tierra Verde
Penny For Pinellas Project

Design: Completed

A picture of the old 13th street bridge

13th Street/Sands Point Drive Bridge Replacement

13th Street S., near 3rd Avenue S. in Tierra Verde
Penny For Pinellas Project
Madonna Boulevard Bridge in Tierra Verde

Madonna Boulevard Bridge Replacement

Madonna Boulevard in Tierra Verde
Penny For Pinellas Project

Design: In progress

Rendering of the Beckett Bridge Replacement project

Beckett Bridge Replacement Project

Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs
Penny For Pinellas Project
San Martin Bridge

San Martin Boulevard Bridge Replacement

Tallahassee Drive to Weedon Drive in St. Petersburg
Penny For Pinellas Project
Picture of existing Shore Drive bridge

Shore Drive Bridge Replacement

Shore Drive in Ozona/Palm Harbor
Penny For Pinellas Project

Ridgemoor Boulevard Bridge Replacement

Ridgemoor Boulevard in East Lake
Penny For Pinellas Project

Design: On hold

Dunedin Causeway

Dunedin Causeway Bridges Project

Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward Island
Penny For Pinellas Project

Facility Construction

Construction: Completed

Bayside Health Clinic

Bayside Health Clinic Expansion and Renovation Overview

14808 49th Street North Clearwater, FL 33762

Design: In progress

St. Pete-Clearwater Airport Terminal Improvement

14700 Terminal Blvd., Clearwater, FL 33762
An aerial view of the lot where the new County Complex will be built with labels for US 19, Ulmerton Rd and Icot Blvd.

New Pinellas County Government Center

Ulmerton Road and Icot Blvd

Intersection Improvements

Construction: In progress

Image of Whitney Road project

Whitney Road and Wolford Road Intersection and Roadway Improvements

The intersection of Whitney Road and Wolford Road, and surrounding area.
Penny For Pinellas Project

Design: In progress

Keystone Road & East Lake Road Emergency Access Improvements

Intersection of East Lake Road & Keystone Road in East Lake
Penny For Pinellas Project

Design: Not started

aerial view of traffic at the Belcher Road and Gulf to Bay Blvd. intersection

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study

Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in Clearwater
Penny For Pinellas Project

Study: Completed

Keystone Road & East Lake Road Emergency Access Improvements

Intersection of East Lake Road & Keystone Road in East Lake
Penny For Pinellas Project

Parks Projects

Construction: Completed

Fort De Soto Bay Pier Replacement

East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains open
Penny For Pinellas Project

Brooker Creek Preserve Boardwalk Rehabilitation

3940 Keystone Rd, Tarpon Springs, FL 34688
Penny For Pinellas Project

Sawgrass Lake Park Boardwalk & Tower Rehabilitation

7400 25th St. N., St. Petersburg, FL 33702
Penny For Pinellas Project

Taylor Lake Seawall Improvements

1100 8th Ave. SW, Largo, Florida 33770
Penny For Pinellas Project

Construction: In progress

Raymond Neri Park image

Raymond H. Neri Community Park Improvements

4303 46th Ave. N., St. Petersburg, FL 33714
Penny For Pinellas Project
High Point Community Park Rendering 2

High Point Community Park

On the site of the former High Point Elementary School
Penny For Pinellas Project
A rendering of the plans for the Dansville Community Park, showing a multi-use path around the pond, restrooms, a picnic shelter, benches and open fields.

Dansville Community Park

Wilcox Road, between Jackson Street and Pine Street
Penny For Pinellas Project

Eagle Lake Park Rehabilitation

1800 Keene Road, Largo
Penny For Pinellas Project

Design: Completed

Sutherland Bayou boat ramp new entrance

Sutherland Bayou Boat Ramp and Driveway Improvements

2119 US Highway 19 Alternate, Palm Harbor, FL 34683
Penny For Pinellas Project

Design: In progress

Joe’s Creek Restoration and Greenway Trail

Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.
Penny For Pinellas Project

Wilde Lands Recreation Area

Brooker Creek Preserve
Penny For Pinellas Project
Philippe Park aerial

Philippe Park Improvements

2525 Philippe Parkway, Safety Harbor
Penny For Pinellas Project

Roadway and Drainage Projects

Construction: Not started

Indian Rocks Road Improvements

Indian Rocks Road, Kent Drive to 8th Avenue SW
Penny For Pinellas Project

Design: In progress

flooded road in Crystal Beach are of Pinellas County

Crystal Beach Drainage and Roadway Improvements

Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery Bayou
Penny For Pinellas Project

Study: Completed

Roadway Improvements

Construction: Completed

22nd Avenue project image

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements

22nd Avenue S. (51st Street to 34th Street)
Penny For Pinellas Project

Construction: In progress

71st Street North project map

71st Street North Roadway Improvements

71st Street N., between 38th Avenue N. and 54th Avenue N.
Penny For Pinellas Project

Design: In progress

Riviere Road at Putnam Park, looking north

Riviere Road Roadway Improvements

Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Penny For Pinellas Project
West Bay Complete Streets project area

West Bay Drive Improvements

West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Penny For Pinellas Project
Nebraska Avenue Roadway Improvements projects at Westlake Blvd. - looking west

Nebraska Avenue Roadway Improvements

Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
Penny For Pinellas Project
102nd Avenue N project map

102nd Avenue N. Roadway Improvements

102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
Penny For Pinellas Project
62nd Avenue North project rendering

62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)

62nd Avenue N., between 49th Street N. and 34th Street N.
Penny For Pinellas Project

Design: Not started

heavy traffic on East Lake Road in Palm Harbor, Florida

East Lake Road Corridor

East Lake Road from south of Curlew Road to north of Trinity Boulevard
Penny For Pinellas Project
54th Avenue project rendering

54th Avenue N. Improvements

54th Avenue N., from 49th Street N. to 34th Street N.
Penny For Pinellas Project

Design: On hold

62nd Avenue project area

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)

62nd Avenue N., between 49th Street N. and 66th Street N.
Penny For Pinellas Project

Study: Completed

54th Avenue project rendering

54th Avenue N. Improvements

54th Avenue N., from 49th Street N. to 34th Street N.
Penny For Pinellas Project
62nd Avenue project area

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)

62nd Avenue N., between 49th Street N. and 66th Street N.
Penny For Pinellas Project

Study: In progress

Whitney Road Complete Streets Project

Whitney Road from US 19 to Bolesta Road

Sidewalk Projects

Construction: Completed

Starkey Road project area image

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)

Starkey Road between Ulmerton Road and East Bay Drive
Penny For Pinellas Project
Mehlenbacher Road project area image

Mehlenbacher Road Sidewalk Improvements

Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Penny For Pinellas Project

Construction: In progress

46th Avenue Project area image

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)

46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Penny For Pinellas Project
Safe Routes to School sample image

Safe Routes To School

Multiple, see community-specific info

Design: In progress

Highland Avenue Improvements

Highland Avenue, from East Bay Drive to Belleair Road
Penny For Pinellas Project

Stormwater and Drainage Projects

Construction: In progress

Roosevelt Creek Channel 5 Aerial map

Roosevelt Creek Channel 5 Improvements

Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
Penny For Pinellas Project
Pinellas County channel example image

NRCS Emergency Debris Removal

Multiple, see map

Design: In progress

heavy equipment works on the Baypointe Stormwater project

Baypointe Stormwater Conservation Area

Seminole area formerly known as the Baypointe Golf Course
Penny For Pinellas Project

Study: In progress

Photograph of flooding at Tarpon Woods

Flood Mitigation Action Plan

Multiple, see map

Cherokee Drive Drainage Improvements

Cherokee Drive/48th Avenue N. area in unincorporated Seminole
Penny For Pinellas Project

Trail Projects

Construction: Completed

pedestrian bridge connecting the Pinellas Trail over the Lake Tarpon Outfall in Palm Harbor

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Pinellas Trail, over the Lake Tarpon outfall canal
Penny For Pinellas Project

Construction: In progress

Pinellas Trail South Gap Phase I and Phase II

Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Penny For Pinellas Project

Design: In progress

Pinellas Trail South Gap Phase I and Phase II

Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Penny For Pinellas Project

McKay Creek Greenway Trail

McKay Creek area
Penny For Pinellas Project

Utilities

Construction: Completed

Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation

Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole

53rd Avenue North Force Main Replacement

53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.

Construction: In progress

Manufactured Housing Communities Utility System Replacement

13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.

Pass-A-Grille Water Main Improvement

St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue

62nd Street North Force Main Replacement

62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.

North Pinellas County Reclaimed Water Booster Pump Station

Community: Palm Harbor - Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.

Oakhurst Shores Wastewater Pump Station Upgrade

Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.

Construction: Not started

Kernwood Ct. Wastewater Force Main Upgrade

PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323

Design: Completed

60-Inch Transmission Water Main Line Valve at Keller

The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.

Design: In progress

Lake Tarpon Septic-to-Sewer Conversion

Three communities northeast of Lake Tarpon.

Gulf Beach Water Booster Station Improvements

The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach

96th Place Sewer Main Replacement

96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.

173rd to 176th Ave East Redington Neighborhood Water Main Replacement

The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.

54th Avenue North Road Force Main Replacement

54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.

Duhme Road Force Main Replacement

Duhme Road from American Legion Drive to 53rd Avenue North

Klosterman Road Force Main Replacement

The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19

Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements

Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.

Kernwood Ct. Wastewater Force Main Upgrade

PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323

Submerged Water Main Upgrade, St. Pete Beach

Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County

Pinellas Park Wastewater Collection System Upgrade

Located in Pinellas Park, Pinellas County

Water Main Upgrade Project-133rd Ave N to 126th Ave N, Largo

133rd to 126th Ave N Neighborhood, Largo, Pinellas County

Design: Not started

Submerged Water Main Upgrade- Madeira Beach to Treasure Island

29th Ave E to Key Capri, Madeira Beach to Treasure Island

Implementation: In Progress

Digital Meter Upgrade

Unincorporated Pinellas County

Study: In progress

Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde

Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.

Beach and Coastal Projects

Photograph of heavy earth moving equipment on Sunset Beach bringing in sand and rebuilding sand dunes.

Emergency Beach Erosion Control Project

Multiple, see map
Status: Construction: Completed

Aerial view of Grand Canal/Dents Channel

Grand Canal (Dents Channel) Dredging

Dents Channel in Tierra Verde
Status: Construction: Completed

Aerial image of Pass-a-Grill Beach

Pass-a-Grille Beach Nourishment

Pass-a-Grille Beach
Status: Construction: Completed

Madeira Beach Access photo of damaged area

Madeira Beach Access Parking Area

14400 Gulf Blvd, Madeira Beach, FL 33708
Status: Construction: Completed

Sand Key beach showing the increased expanse of sand between beach that has been renourished and beach that has not.

2025 Pinellas County Beach Nourishment Project

The island of Sand Key, Treasure Island and Upham Beach.
Status: Construction: In progress

Bridge Projects

Rendering of the Beckett Bridge Replacement project

Beckett Bridge Replacement Project

Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs
Status: Design: In progress

Penny For Pinellas Project
Dunedin Causeway

Dunedin Causeway Bridges Project

Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward Island
Status: Design: On hold

Penny For Pinellas Project
San Martin Bridge

San Martin Boulevard Bridge Replacement

Tallahassee Drive to Weedon Drive in St. Petersburg
Status: Design: In progress

Penny For Pinellas Project
Westwinds and Crosswinds bridges in Palm Harbor, Florida

Westwinds and Crosswinds Bridges Project

Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.
Status: Construction: Completed

Penny For Pinellas Project
replacement bridge on Oakwood Drive in Pinellas County

Oakwood Drive Bridge Replacement

Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivision
Status: Construction: In progress

Penny For Pinellas Project
A picture of the old 13th street bridge

13th Street/Sands Point Drive Bridge Replacement

13th Street S., near 3rd Avenue S. in Tierra Verde
Status: Design: Completed, Construction: Not started

Penny For Pinellas Project
Madonna Boulevard Bridge in Tierra Verde

Madonna Boulevard Bridge Replacement

Madonna Boulevard in Tierra Verde
Status: Design: Completed, Construction: Not started

Penny For Pinellas Project
Picture of existing Shore Drive bridge

Shore Drive Bridge Replacement

Shore Drive in Ozona/Palm Harbor
Status: Design: In progress

Penny For Pinellas Project
A picture of the newly paved road approaching the new bridge on Old Coachman Road. The road curves to the left to the new bridge, and there are piles of dirt, construction barriers and construction equipment.

Old Coachman Road Bridge Replacement

Old Coachman Road, north of Sharkey Road
Status: Construction: Completed

Penny For Pinellas Project

Ridgemoor Boulevard Bridge Replacement

Ridgemoor Boulevard in East Lake
Status: Design: In progress

Penny For Pinellas Project

Facility Construction

Bayside Health Clinic

Bayside Health Clinic Expansion and Renovation Overview

14808 49th Street North Clearwater, FL 33762
Status: Construction: Completed

St. Pete-Clearwater Airport Terminal Improvement

14700 Terminal Blvd., Clearwater, FL 33762
Status: Design: In progress

An aerial view of the lot where the new County Complex will be built with labels for US 19, Ulmerton Rd and Icot Blvd.

New Pinellas County Government Center

Ulmerton Road and Icot Blvd
Status: Design: In progress

Intersection Improvements

aerial view of traffic at the Belcher Road and Gulf to Bay Blvd. intersection

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study

Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in Clearwater
Status: Design: Not started

Penny For Pinellas Project
Image of Whitney Road project

Whitney Road and Wolford Road Intersection and Roadway Improvements

The intersection of Whitney Road and Wolford Road, and surrounding area.
Status: Construction: In progress

Penny For Pinellas Project

Keystone Road & East Lake Road Emergency Access Improvements

Intersection of East Lake Road & Keystone Road in East Lake
Status: Design: In progress, Study: Completed

Penny For Pinellas Project

Parks Projects

Sutherland Bayou boat ramp new entrance

Sutherland Bayou Boat Ramp and Driveway Improvements

2119 US Highway 19 Alternate, Palm Harbor, FL 34683
Status: Design: Completed

Penny For Pinellas Project

Fort De Soto Bay Pier Replacement

East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains open
Status: Construction: Completed

Penny For Pinellas Project
Raymond Neri Park image

Raymond H. Neri Community Park Improvements

4303 46th Ave. N., St. Petersburg, FL 33714
Status: Construction: In progress

Penny For Pinellas Project

Brooker Creek Preserve Boardwalk Rehabilitation

3940 Keystone Rd, Tarpon Springs, FL 34688
Status: Construction: Completed

Penny For Pinellas Project

Joe’s Creek Restoration and Greenway Trail

Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.
Status: Design: In progress

Penny For Pinellas Project
High Point Community Park Rendering 2

High Point Community Park

On the site of the former High Point Elementary School
Status: Construction: In progress

Penny For Pinellas Project
A rendering of the plans for the Dansville Community Park, showing a multi-use path around the pond, restrooms, a picnic shelter, benches and open fields.

Dansville Community Park

Wilcox Road, between Jackson Street and Pine Street
Status: Construction: In progress

Penny For Pinellas Project

Sawgrass Lake Park Boardwalk & Tower Rehabilitation

7400 25th St. N., St. Petersburg, FL 33702
Status: Construction: Completed

Penny For Pinellas Project

Brooker Creek Preserve – Four Lakes Hammock Recreation Area

Brooker Creek Preserve
Status: Design: In progress

Penny For Pinellas Project
aerial view of the Weedon Island salt marsh after the restoration project

Weedon Island Preserve Salt Marsh Restoration

Weedon Island Preserve
Status: Construction: Completed

Penny For Pinellas Project

Wilde Lands Recreation Area

Brooker Creek Preserve
Status: Design: In progress

Penny For Pinellas Project

Taylor Lake Seawall Improvements

1100 8th Ave. SW, Largo, Florida 33770
Status: Construction: Completed

Penny For Pinellas Project
aerial view of 119th Street North project area

Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)

12700 119th Street N., Largo, FL 33778
Status: Construction: In progress

Philippe Park aerial

Philippe Park Improvements

2525 Philippe Parkway, Safety Harbor
Status: Design: In progress

Penny For Pinellas Project

Weedon Island Boardwalk and Pier Rehabilitation

Weedon Island Preserve
Status: Construction: Completed

Penny For Pinellas Project

Eagle Lake Park Rehabilitation

1800 Keene Road, Largo
Status: Construction: Completed

Penny For Pinellas Project
Fort De Soto aerial image

Fort De Soto Park Repairs and Improvements

3500 Pinellas Bayway S.
Status: Design: In progress

Penny For Pinellas Project

Roadway and Drainage Projects

flooded road in Crystal Beach are of Pinellas County

Crystal Beach Drainage and Roadway Improvements

Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery Bayou
Status: Design: In progress

Penny For Pinellas Project
Anclote Rd. Roadway and Stormwater improvements project

Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)

Anclote Road from Anclote Blvd. to Alternate US 19
Status: Study: Completed

Penny For Pinellas Project

Indian Rocks Road Improvements

Indian Rocks Road, Kent Drive to 8th Avenue SW
Status: Construction: In progress

Penny For Pinellas Project

Roadway Improvements

heavy traffic on East Lake Road in Palm Harbor, Florida

East Lake Road Corridor

East Lake Road from south of Curlew Road to north of Trinity Boulevard
Status: Study: In progress

Penny For Pinellas Project
Riviere Road at Putnam Park, looking north

Riviere Road Roadway Improvements

Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Status: Design: In progress

Penny For Pinellas Project
Forest Lakes widening project in Pinellas County, FL

Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)

Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road
Status: Design: In progress

Penny For Pinellas Project
West Bay Complete Streets project area

West Bay Drive Improvements

West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Status: Design: In progress

Penny For Pinellas Project
Nebraska Avenue Roadway Improvements projects at Westlake Blvd. - looking west

Nebraska Avenue Roadway Improvements

Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
Status: Design: In progress

Penny For Pinellas Project
71st Street North project map

71st Street North Roadway Improvements

71st Street N., between 38th Avenue N. and 54th Avenue N.
Status: Construction: In progress

Penny For Pinellas Project
102nd Avenue N project map

102nd Avenue N. Roadway Improvements

102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
Status: Design: In progress

Penny For Pinellas Project

Whitney Road Complete Streets Project

Whitney Road from US 19 to Bolesta Road
Status: Study: Completed

62nd Avenue North project rendering

62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)

62nd Avenue N., between 49th Street N. and 34th Street N.
Status: Design: In progress

Penny For Pinellas Project
54th Avenue project rendering

54th Avenue N. Improvements

54th Avenue N., from 49th Street N. to 34th Street N.
Status: Design: Not started, Study: Completed

Penny For Pinellas Project
62nd Avenue project area

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)

62nd Avenue N., between 49th Street N. and 66th Street N.
Status: Study: Completed, Design: On hold

Penny For Pinellas Project
22nd Avenue project image

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements

22nd Avenue S. (51st Street to 34th Street)
Status: Construction: Completed

Penny For Pinellas Project

Sidewalk Projects

46th Avenue Project area image

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)

46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Status: Construction: In progress

Penny For Pinellas Project
Starkey Road project area image

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)

Starkey Road between Ulmerton Road and East Bay Drive
Status: Construction: Completed

Penny For Pinellas Project
Mehlenbacher Road project area image

Mehlenbacher Road Sidewalk Improvements

Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Status: Construction: Completed

Penny For Pinellas Project
Safe Routes to School sample image

Safe Routes To School

Multiple, see community-specific info
Status: Construction: In progress

Highland Avenue Improvements

Highland Avenue, from East Bay Drive to Belleair Road
Status: Design: In progress

Penny For Pinellas Project

Stormwater and Drainage Projects

heavy equipment works on the Baypointe Stormwater project

Baypointe Stormwater Conservation Area

Seminole area formerly known as the Baypointe Golf Course
Status: Design: In progress

Penny For Pinellas Project
Photograph of flooding at Tarpon Woods

Flood Mitigation Action Plan

Multiple, see map
Status: Study: In progress

Roosevelt Creek Channel 5 Aerial map

Roosevelt Creek Channel 5 Improvements

Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
Status: Construction: In progress

Penny For Pinellas Project

Cherokee Drive Drainage Improvements

Cherokee Drive/48th Avenue N. area in unincorporated Seminole
Status: Study: In progress

Penny For Pinellas Project
Pinellas County channel example image

NRCS Emergency Debris Removal

Multiple, see map
Status: Construction: In progress

Trail Projects

pedestrian bridge connecting the Pinellas Trail over the Lake Tarpon Outfall in Palm Harbor

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Pinellas Trail, over the Lake Tarpon outfall canal
Status: Construction: Completed

Penny For Pinellas Project

Pinellas Trail South Gap Phase I and Phase II

Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Status: Design: In progress, Construction: In progress

Penny For Pinellas Project

McKay Creek Greenway Trail

McKay Creek area
Status: Design: In progress

Penny For Pinellas Project

Utilities

Digital Meter Upgrade

Unincorporated Pinellas County
Status: Implementation: In Progress

Manufactured Housing Communities Utility System Replacement

13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.
Status: Construction: In progress

Lake Tarpon Septic-to-Sewer Conversion

Three communities northeast of Lake Tarpon.
Status: Design: In progress

Pass-A-Grille Water Main Improvement

St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue
Status: Construction: In progress

Gulf Beach Water Booster Station Improvements

The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach
Status: Design: In progress

Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation

Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole
Status: Construction: Completed

53rd Avenue North Force Main Replacement

53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.
Status: Construction: Completed

62nd Street North Force Main Replacement

62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.
Status: Construction: In progress

96th Place Sewer Main Replacement

96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.
Status: Design: In progress

173rd to 176th Ave East Redington Neighborhood Water Main Replacement

The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.
Status: Design: In progress

54th Avenue North Road Force Main Replacement

54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.
Status: Design: In progress

Duhme Road Force Main Replacement

Duhme Road from American Legion Drive to 53rd Avenue North
Status: Design: In progress

Klosterman Road Force Main Replacement

The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19
Status: Design: In progress

Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde

Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.
Status: Study: In progress

North Pinellas County Reclaimed Water Booster Pump Station

Community: Palm Harbor - Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.
Status: Construction: In progress

60-Inch Transmission Water Main Line Valve at Keller

The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.
Status: Design: Completed

Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements

Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.
Status: Design: In progress

Kernwood Ct. Wastewater Force Main Upgrade

PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323
Status: Design: In progress, Construction: Not started

Submerged Water Main Upgrade- Madeira Beach to Treasure Island

29th Ave E to Key Capri, Madeira Beach to Treasure Island
Status: Design: Not started

Submerged Water Main Upgrade, St. Pete Beach

Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County
Status: Design: In progress

Oakhurst Shores Wastewater Pump Station Upgrade

Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.
Status: Construction: In progress

Pinellas Park Wastewater Collection System Upgrade

Located in Pinellas Park, Pinellas County
Status: Design: In progress

Water Main Upgrade Project-133rd Ave N to 126th Ave N, Largo

133rd to 126th Ave N Neighborhood, Largo, Pinellas County
Status: Design: In progress

102nd Avenue N project map

102nd Avenue N. Roadway Improvements

102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project
A picture of the old 13th street bridge

13th Street/Sands Point Drive Bridge Replacement

13th Street S., near 3rd Avenue S. in Tierra Verde
Status: Design: Completed, Construction: Not started
Type: Bridge Projects
Penny For Pinellas Project

173rd to 176th Ave East Redington Neighborhood Water Main Replacement

The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.
Status: Design: In progress
Type: Utilities
Sand Key beach showing the increased expanse of sand between beach that has been renourished and beach that has not.

2025 Pinellas County Beach Nourishment Project

The island of Sand Key, Treasure Island and Upham Beach.
Status: Construction: In progress
Type: Beach and Coastal Projects
22nd Avenue project image

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements

22nd Avenue S. (51st Street to 34th Street)
Status: Construction: Completed
Type: Roadway Improvements
Penny For Pinellas Project
46th Avenue Project area image

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)

46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Status: Construction: In progress
Type: Sidewalk Projects
Penny For Pinellas Project

53rd Avenue North Force Main Replacement

53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.
Status: Construction: Completed
Type: Utilities
54th Avenue project rendering

54th Avenue N. Improvements

54th Avenue N., from 49th Street N. to 34th Street N.
Status: Design: Not started, Study: Completed
Type: Roadway Improvements
Penny For Pinellas Project

54th Avenue North Road Force Main Replacement

54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.
Status: Design: In progress
Type: Utilities

60-Inch Transmission Water Main Line Valve at Keller

The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.
Status: Design: Completed
Type: Utilities
62nd Avenue North project rendering

62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)

62nd Avenue N., between 49th Street N. and 34th Street N.
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project
62nd Avenue project area

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)

62nd Avenue N., between 49th Street N. and 66th Street N.
Status: Study: Completed, Design: On hold
Type: Roadway Improvements
Penny For Pinellas Project

62nd Street North Force Main Replacement

62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.
Status: Construction: In progress
Type: Utilities
71st Street North project map

71st Street North Roadway Improvements

71st Street N., between 38th Avenue N. and 54th Avenue N.
Status: Construction: In progress
Type: Roadway Improvements
Penny For Pinellas Project

96th Place Sewer Main Replacement

96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.
Status: Design: In progress
Type: Utilities
Anclote Rd. Roadway and Stormwater improvements project

Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)

Anclote Road from Anclote Blvd. to Alternate US 19
Status: Study: Completed
Type: Roadway and Drainage Projects
Penny For Pinellas Project
heavy equipment works on the Baypointe Stormwater project

Baypointe Stormwater Conservation Area

Seminole area formerly known as the Baypointe Golf Course
Status: Design: In progress
Type: Stormwater and Drainage Projects
Penny For Pinellas Project
Bayside Health Clinic

Bayside Health Clinic Expansion and Renovation Overview

14808 49th Street North Clearwater, FL 33762
Status: Construction: Completed
Type: Facility Construction
Rendering of the Beckett Bridge Replacement project

Beckett Bridge Replacement Project

Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs
Status: Design: In progress
Type: Bridge Projects
Penny For Pinellas Project
aerial view of traffic at the Belcher Road and Gulf to Bay Blvd. intersection

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study

Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in Clearwater
Status: Design: Not started
Type: Intersection Improvements
Penny For Pinellas Project

Brooker Creek Preserve – Four Lakes Hammock Recreation Area

Brooker Creek Preserve
Status: Design: In progress
Type: Parks Projects
Penny For Pinellas Project

Brooker Creek Preserve Boardwalk Rehabilitation

3940 Keystone Rd, Tarpon Springs, FL 34688
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project

Cherokee Drive Drainage Improvements

Cherokee Drive/48th Avenue N. area in unincorporated Seminole
Status: Study: In progress
Type: Stormwater and Drainage Projects
Penny For Pinellas Project
flooded road in Crystal Beach are of Pinellas County

Crystal Beach Drainage and Roadway Improvements

Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery Bayou
Status: Design: In progress
Type: Roadway and Drainage Projects
Penny For Pinellas Project
A rendering of the plans for the Dansville Community Park, showing a multi-use path around the pond, restrooms, a picnic shelter, benches and open fields.

Dansville Community Park

Wilcox Road, between Jackson Street and Pine Street
Status: Construction: In progress
Type: Parks Projects
Penny For Pinellas Project

Digital Meter Upgrade

Unincorporated Pinellas County
Status: Implementation: In Progress
Type: Utilities

Duhme Road Force Main Replacement

Duhme Road from American Legion Drive to 53rd Avenue North
Status: Design: In progress
Type: Utilities
Dunedin Causeway

Dunedin Causeway Bridges Project

Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward Island
Status: Design: On hold
Type: Bridge Projects
Penny For Pinellas Project

Eagle Lake Park Rehabilitation

1800 Keene Road, Largo
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project
heavy traffic on East Lake Road in Palm Harbor, Florida

East Lake Road Corridor

East Lake Road from south of Curlew Road to north of Trinity Boulevard
Status: Study: In progress
Type: Roadway Improvements
Penny For Pinellas Project
Photograph of heavy earth moving equipment on Sunset Beach bringing in sand and rebuilding sand dunes.

Emergency Beach Erosion Control Project

Multiple, see map
Status: Construction: Completed
Type: Beach and Coastal Projects
Photograph of flooding at Tarpon Woods

Flood Mitigation Action Plan

Multiple, see map
Status: Study: In progress
Type: Stormwater and Drainage Projects

Flood Vulnerability Assessment


Type: Stormwater and Drainage Projects
Forest Lakes widening project in Pinellas County, FL

Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)

Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project

Fort De Soto Bay Pier Replacement

East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains open
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project
Fort De Soto aerial image

Fort De Soto Park Repairs and Improvements

3500 Pinellas Bayway S.
Status: Design: In progress
Type: Parks Projects
Penny For Pinellas Project
Aerial view of Grand Canal/Dents Channel

Grand Canal (Dents Channel) Dredging

Dents Channel in Tierra Verde
Status: Construction: Completed
Type: Beach and Coastal Projects

Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation

Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole
Status: Construction: Completed
Type: Utilities

Gulf Beach Water Booster Station Improvements

The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach
Status: Design: In progress
Type: Utilities
High Point Community Park Rendering 2

High Point Community Park

On the site of the former High Point Elementary School
Status: Construction: In progress
Type: Parks Projects
Penny For Pinellas Project

Highland Avenue Improvements

Highland Avenue, from East Bay Drive to Belleair Road
Status: Design: In progress
Type: Sidewalk Projects
Penny For Pinellas Project

Indian Rocks Road Improvements

Indian Rocks Road, Kent Drive to 8th Avenue SW
Status: Construction: In progress
Type: Roadway and Drainage Projects
Penny For Pinellas Project

Joe’s Creek Restoration and Greenway Trail

Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.
Status: Design: In progress
Type: Parks Projects
Penny For Pinellas Project

Kernwood Ct. Wastewater Force Main Upgrade

PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323
Status: Design: In progress, Construction: Not started
Type: Utilities

Keystone Road & East Lake Road Emergency Access Improvements

Intersection of East Lake Road & Keystone Road in East Lake
Status: Design: In progress, Study: Completed
Type: Intersection Improvements
Penny For Pinellas Project

Klosterman Road Force Main Replacement

The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19
Status: Design: In progress
Type: Utilities

Lake Tarpon Septic-to-Sewer Conversion

Three communities northeast of Lake Tarpon.
Status: Design: In progress
Type: Utilities
Madeira Beach Access photo of damaged area

Madeira Beach Access Parking Area

14400 Gulf Blvd, Madeira Beach, FL 33708
Status: Construction: Completed
Type: Beach and Coastal Projects
Madonna Boulevard Bridge in Tierra Verde

Madonna Boulevard Bridge Replacement

Madonna Boulevard in Tierra Verde
Status: Design: Completed, Construction: Not started
Type: Bridge Projects
Penny For Pinellas Project

Manufactured Housing Communities Utility System Replacement

13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.
Status: Construction: In progress
Type: Utilities

McKay Creek Greenway Trail

McKay Creek area
Status: Design: In progress
Type: Trail Projects
Penny For Pinellas Project
Mehlenbacher Road project area image

Mehlenbacher Road Sidewalk Improvements

Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Status: Construction: Completed
Type: Sidewalk Projects
Penny For Pinellas Project
Nebraska Avenue Roadway Improvements projects at Westlake Blvd. - looking west

Nebraska Avenue Roadway Improvements

Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project
An aerial view of the lot where the new County Complex will be built with labels for US 19, Ulmerton Rd and Icot Blvd.

New Pinellas County Government Center

Ulmerton Road and Icot Blvd
Status: Design: In progress
Type: Facility Construction

North Pinellas County Reclaimed Water Booster Pump Station

Community: Palm Harbor - Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.
Status: Construction: In progress
Type: Utilities
Pinellas County channel example image

NRCS Emergency Debris Removal

Multiple, see map
Status: Construction: In progress
Type: Stormwater and Drainage Projects

Oakhurst Shores Wastewater Pump Station Upgrade

Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.
Status: Construction: In progress
Type: Utilities
replacement bridge on Oakwood Drive in Pinellas County

Oakwood Drive Bridge Replacement

Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivision
Status: Construction: In progress
Type: Bridge Projects
Penny For Pinellas Project
A picture of the newly paved road approaching the new bridge on Old Coachman Road. The road curves to the left to the new bridge, and there are piles of dirt, construction barriers and construction equipment.

Old Coachman Road Bridge Replacement

Old Coachman Road, north of Sharkey Road
Status: Construction: Completed
Type: Bridge Projects
Penny For Pinellas Project
Aerial image of Pass-a-Grill Beach

Pass-a-Grille Beach Nourishment

Pass-a-Grille Beach
Status: Construction: Completed
Type: Beach and Coastal Projects

Pass-A-Grille Water Main Improvement

St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue
Status: Construction: In progress
Type: Utilities
Philippe Park aerial

Philippe Park Improvements

2525 Philippe Parkway, Safety Harbor
Status: Design: In progress
Type: Parks Projects
Penny For Pinellas Project

Pinellas Park Wastewater Collection System Upgrade

Located in Pinellas Park, Pinellas County
Status: Design: In progress
Type: Utilities
pedestrian bridge connecting the Pinellas Trail over the Lake Tarpon Outfall in Palm Harbor

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge

Pinellas Trail, over the Lake Tarpon outfall canal
Status: Construction: Completed
Type: Trail Projects
Penny For Pinellas Project

Pinellas Trail South Gap Phase I and Phase II

Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Status: Design: In progress, Construction: In progress
Type: Trail Projects
Penny For Pinellas Project
Raymond Neri Park image

Raymond H. Neri Community Park Improvements

4303 46th Ave. N., St. Petersburg, FL 33714
Status: Construction: In progress
Type: Parks Projects
Penny For Pinellas Project
aerial view of 119th Street North project area

Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)

12700 119th Street N., Largo, FL 33778
Status: Construction: In progress
Type: Parks Projects

Ridgemoor Boulevard Bridge Replacement

Ridgemoor Boulevard in East Lake
Status: Design: In progress
Type: Bridge Projects
Penny For Pinellas Project
Riviere Road at Putnam Park, looking north

Riviere Road Roadway Improvements

Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project
Roosevelt Creek Channel 5 Aerial map

Roosevelt Creek Channel 5 Improvements

Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
Status: Construction: In progress
Type: Stormwater and Drainage Projects
Penny For Pinellas Project
Safe Routes to School sample image

Safe Routes To School

Multiple, see community-specific info
Status: Construction: In progress
Type: Sidewalk Projects
San Martin Bridge

San Martin Boulevard Bridge Replacement

Tallahassee Drive to Weedon Drive in St. Petersburg
Status: Design: In progress
Type: Bridge Projects
Penny For Pinellas Project

Sawgrass Lake Park Boardwalk & Tower Rehabilitation

7400 25th St. N., St. Petersburg, FL 33702
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project
Picture of existing Shore Drive bridge

Shore Drive Bridge Replacement

Shore Drive in Ozona/Palm Harbor
Status: Design: In progress
Type: Bridge Projects
Penny For Pinellas Project

St. Pete-Clearwater Airport Terminal Improvement

14700 Terminal Blvd., Clearwater, FL 33762
Status: Design: In progress
Type: Facility Construction
Starkey Road project area image

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)

Starkey Road between Ulmerton Road and East Bay Drive
Status: Construction: Completed
Type: Sidewalk Projects
Penny For Pinellas Project

Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde

Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.
Status: Study: In progress
Type: Utilities

Submerged Water Main Upgrade- Madeira Beach to Treasure Island

29th Ave E to Key Capri, Madeira Beach to Treasure Island
Status: Design: Not started
Type: Utilities

Submerged Water Main Upgrade, St. Pete Beach

Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County
Status: Design: In progress
Type: Utilities
Sutherland Bayou boat ramp new entrance

Sutherland Bayou Boat Ramp and Driveway Improvements

2119 US Highway 19 Alternate, Palm Harbor, FL 34683
Status: Design: Completed
Type: Parks Projects
Penny For Pinellas Project

Taylor Lake Seawall Improvements

1100 8th Ave. SW, Largo, Florida 33770
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project

Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements

Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.
Status: Design: In progress
Type: Utilities

Water Main Upgrade Project-133rd Ave N to 126th Ave N, Largo

133rd to 126th Ave N Neighborhood, Largo, Pinellas County
Status: Design: In progress
Type: Utilities

Weedon Island Boardwalk and Pier Rehabilitation

Weedon Island Preserve
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project
aerial view of the Weedon Island salt marsh after the restoration project

Weedon Island Preserve Salt Marsh Restoration

Weedon Island Preserve
Status: Construction: Completed
Type: Parks Projects
Penny For Pinellas Project
West Bay Complete Streets project area

West Bay Drive Improvements

West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Status: Design: In progress
Type: Roadway Improvements
Penny For Pinellas Project
Westwinds and Crosswinds bridges in Palm Harbor, Florida

Westwinds and Crosswinds Bridges Project

Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.
Status: Construction: Completed
Type: Bridge Projects
Penny For Pinellas Project
Image of Whitney Road project

Whitney Road and Wolford Road Intersection and Roadway Improvements

The intersection of Whitney Road and Wolford Road, and surrounding area.
Status: Construction: In progress
Type: Intersection Improvements
Penny For Pinellas Project

Whitney Road Complete Streets Project

Whitney Road from US 19 to Bolesta Road
Status: Study: Completed
Type: Roadway Improvements

Wilde Lands Recreation Area

Brooker Creek Preserve
Status: Design: In progress
Type: Parks Projects
Penny For Pinellas Project