Pinellas County Projects
Pinellas County is always working on projects to preserve and improve infrastructure, support our economy and meet the needs of the public. Major projects are listed below. See projects on a map.
Beach and Coastal Projects
Construction: Completed

Emergency Beach Erosion Control Project
Multiple, see map
Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra Verde
Pass-a-Grille Beach Nourishment
Pass-a-Grille Beach
Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708Construction: In progress

2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.Bridge Projects
Construction: Completed

Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.Construction: In progress

Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivisionConstruction: Not started
Design: Completed
Design: In progress

Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon SpringsRidgemoor Boulevard Bridge Replacement
Ridgemoor Boulevard in East LakeDesign: On hold

Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward IslandFacility Construction
Construction: Completed

Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North Clearwater, FL 33762Design: In progress

St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762
New Pinellas County Government Center
Ulmerton Road and Icot BlvdIntersection Improvements
Construction: In progress

Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.Design: In progress
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeDesign: Not started

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in ClearwaterStudy: Completed
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeParks Projects
Construction: Completed

Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains openBrooker Creek Preserve Boardwalk Rehabilitation
3940 Keystone Rd, Tarpon Springs, FL 34688Sawgrass Lake Park Boardwalk & Tower Rehabilitation
7400 25th St. N., St. Petersburg, FL 33702Taylor Lake Seawall Improvements
1100 8th Ave. SW, Largo, Florida 33770Weedon Island Boardwalk and Pier Rehabilitation
Weedon Island PreserveConstruction: In progress

Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778Eagle Lake Park Rehabilitation
1800 Keene Road, LargoDesign: Completed

Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683Design: In progress

Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.Brooker Creek Preserve – Four Lakes Hammock Recreation Area
Brooker Creek PreserveWilde Lands Recreation Area
Brooker Creek PreserveRoadway and Drainage Projects
Construction: Not started
Indian Rocks Road Improvements
Indian Rocks Road, Kent Drive to 8th Avenue SWDesign: In progress

Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery BayouStudy: Completed

Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19Roadway Improvements
Construction: Completed

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)Construction: In progress
Design: In progress

Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road
West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.Design: Not started
Design: On hold

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Study: Completed

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Study: In progress
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta RoadSidewalk Projects
Construction: Completed

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay Drive
Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair BluffsConstruction: In progress

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Safe Routes To School
Multiple, see community-specific infoDesign: In progress
Highland Avenue Improvements
Highland Avenue, from East Bay Drive to Belleair RoadStormwater and Drainage Projects
Construction: In progress

Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
NRCS Emergency Debris Removal
Multiple, see mapDesign: In progress
Study: In progress

Flood Mitigation Action Plan
Multiple, see mapCherokee Drive Drainage Improvements
Cherokee Drive/48th Avenue N. area in unincorporated SeminoleTrail Projects
Construction: Completed

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canalConstruction: In progress

Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in LargoDesign: In progress

Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in LargoMcKay Creek Greenway Trail
McKay Creek areaUtilities
Construction: Completed
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.Construction: In progress
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.North Pinellas County Reclaimed Water Booster Pump Station
Community: Palm Harbor - Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.Oakhurst Shores Wastewater Pump Station Upgrade
Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.Construction: Not started
Kernwood Ct. Wastewater Force Main Upgrade
PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323Design: Completed
60-Inch Transmission Water Main Line Valve at Keller
The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.Design: In progress
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue NorthKlosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements
Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.Kernwood Ct. Wastewater Force Main Upgrade
PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323Submerged Water Main Upgrade, St. Pete Beach
Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas CountyPinellas Park Wastewater Collection System Upgrade
Located in Pinellas Park, Pinellas CountyWater Main Upgrade Project-133rd Ave N to 126th Ave N, Largo
133rd to 126th Ave N Neighborhood, Largo, Pinellas CountyDesign: Not started
Submerged Water Main Upgrade- Madeira Beach to Treasure Island
29th Ave E to Key Capri, Madeira Beach to Treasure IslandImplementation: In Progress
Digital Meter Upgrade
Unincorporated Pinellas CountyStudy: In progress
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.Beach and Coastal Projects

Emergency Beach Erosion Control Project
Multiple, see map
Status: Construction: Completed

Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra Verde
Status: Construction: Completed

Pass-a-Grille Beach Nourishment
Pass-a-Grille Beach
Status: Construction: Completed

Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708
Status: Construction: Completed

2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.
Status: Construction: In progress
Bridge Projects

Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon Springs
Status: Design: In progress

Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward Island
Status: Design: On hold

San Martin Boulevard Bridge Replacement
Tallahassee Drive to Weedon Drive in St. Petersburg
Status: Design: In progress

Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.
Status: Construction: Completed

Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivision
Status: Construction: In progress

13th Street/Sands Point Drive Bridge Replacement
13th Street S., near 3rd Avenue S. in Tierra Verde
Status: Design: Completed, Construction: Not started

Madonna Boulevard Bridge Replacement
Madonna Boulevard in Tierra Verde
Status: Design: Completed, Construction: Not started

Old Coachman Road Bridge Replacement
Old Coachman Road, north of Sharkey Road
Status: Construction: Completed
Ridgemoor Boulevard Bridge Replacement
Ridgemoor Boulevard in East Lake
Status: Design: In progress
Facility Construction

Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North
Clearwater, FL 33762
Status: Construction: Completed

St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762
Status: Design: In progress

New Pinellas County Government Center
Ulmerton Road and Icot Blvd
Status: Design: In progress
Intersection Improvements

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in Clearwater
Status: Design: Not started

Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.
Status: Construction: In progress
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East Lake
Status: Design: In progress, Study: Completed
Parks Projects

Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683
Status: Design: Completed

Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains open
Status: Construction: Completed

Raymond H. Neri Community Park Improvements
4303 46th Ave. N., St. Petersburg, FL 33714
Status: Construction: In progress
Brooker Creek Preserve Boardwalk Rehabilitation
3940 Keystone Rd, Tarpon Springs, FL 34688
Status: Construction: Completed

Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.
Status: Design: In progress

High Point Community Park
On the site of the former High Point Elementary School
Status: Construction: In progress

Dansville Community Park
Wilcox Road, between Jackson Street and Pine Street
Status: Construction: In progress
Sawgrass Lake Park Boardwalk & Tower Rehabilitation
7400 25th St. N., St. Petersburg, FL 33702
Status: Construction: Completed
Brooker Creek Preserve – Four Lakes Hammock Recreation Area
Brooker Creek Preserve
Status: Design: In progress

Weedon Island Preserve Salt Marsh Restoration
Weedon Island Preserve
Status: Construction: Completed
Wilde Lands Recreation Area
Brooker Creek Preserve
Status: Design: In progress
Taylor Lake Seawall Improvements
1100 8th Ave. SW,
Largo, Florida 33770
Status: Construction: Completed

Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778
Status: Construction: In progress
Weedon Island Boardwalk and Pier Rehabilitation
Weedon Island Preserve
Status: Construction: Completed
Eagle Lake Park Rehabilitation
1800 Keene Road, Largo
Status: Construction: Completed
Roadway and Drainage Projects

Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery Bayou
Status: Design: In progress

Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19
Status: Study: Completed
Indian Rocks Road Improvements
Indian Rocks Road, Kent Drive to 8th Avenue SW
Status: Construction: In progress
Roadway Improvements

East Lake Road Corridor
East Lake Road from south of Curlew Road to north of Trinity Boulevard
Status: Study: In progress

Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm Harbor
Status: Design: In progress

Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa Road
Status: Design: In progress

West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of Largo
Status: Design: In progress

Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm Harbor
Status: Design: In progress

71st Street North Roadway Improvements
71st Street N., between 38th Avenue N. and 54th Avenue N.
Status: Construction: In progress

102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.
Status: Design: In progress
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta Road
Status: Study: Completed

62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.
Status: Design: In progress

54th Avenue N. Improvements
54th Avenue N., from 49th Street N. to 34th Street N.
Status: Design: Not started, Study: Completed

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.
Status: Study: Completed, Design: On hold

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)
Status: Construction: Completed
Sidewalk Projects

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street North
Status: Construction: In progress

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay Drive
Status: Construction: Completed

Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair Bluffs
Status: Construction: Completed

Safe Routes To School
Multiple, see community-specific info
Status: Construction: In progress
Highland Avenue Improvements
Highland Avenue, from East Bay Drive to Belleair Road
Status: Design: In progress
Stormwater and Drainage Projects

Baypointe Stormwater Conservation Area
Seminole area formerly known as the Baypointe Golf Course
Status: Design: In progress

Flood Mitigation Action Plan
Multiple, see map
Status: Study: In progress

Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in Clearwater
Status: Construction: In progress
Cherokee Drive Drainage Improvements
Cherokee Drive/48th Avenue N. area in unincorporated Seminole
Status: Study: In progress

NRCS Emergency Debris Removal
Multiple, see map
Status: Construction: In progress
Trail Projects

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canal
Status: Construction: Completed

Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in Largo
Status: Design: In progress, Construction: In progress
McKay Creek Greenway Trail
McKay Creek area
Status: Design: In progress
Utilities
Digital Meter Upgrade
Unincorporated Pinellas County
Status: Implementation: In Progress
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.
Status: Construction: In progress
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.
Status: Design: In progress
Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd Avenue
Status: Construction: In progress
Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete Beach
Status: Design: In progress
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in Seminole
Status: Construction: Completed
53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.
Status: Construction: Completed
62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.
Status: Construction: In progress
96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.
Status: Design: In progress
173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.
Status: Design: In progress
54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.
Status: Design: In progress
Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue North
Status: Design: In progress
Klosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19
Status: Design: In progress
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.
Status: Study: In progress
North Pinellas County Reclaimed Water Booster Pump Station
Community: Palm Harbor - Fox Chase area
Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor.
See project map for details.
Status: Construction: In progress
60-Inch Transmission Water Main Line Valve at Keller
The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.
Status: Design: Completed
Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements
Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.
Status: Design: In progress
Kernwood Ct. Wastewater Force Main Upgrade
PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road.
PS 323 FM Modification: Force Main modification near Alderman Road and PS 323
Status: Design: In progress, Construction: Not started
Submerged Water Main Upgrade- Madeira Beach to Treasure Island
29th Ave E to Key Capri, Madeira Beach to Treasure Island
Status: Design: Not started
Submerged Water Main Upgrade, St. Pete Beach
Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas County
Status: Design: In progress
Oakhurst Shores Wastewater Pump Station Upgrade
Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.
Status: Construction: In progress
Pinellas Park Wastewater Collection System Upgrade
Located in Pinellas Park, Pinellas County
Status: Design: In progress
Water Main Upgrade Project-133rd Ave N to 126th Ave N, Largo
133rd to 126th Ave N Neighborhood, Largo, Pinellas County
Status: Design: In progress

102nd Avenue N. Roadway Improvements
102nd Avenue, between 113th Street N. and 125th Street N., in unincorporated Seminole.Status: Design: In progress
Type: Roadway Improvements

13th Street/Sands Point Drive Bridge Replacement
13th Street S., near 3rd Avenue S. in Tierra VerdeStatus: Design: Completed, Construction: Not started
Type: Bridge Projects
173rd to 176th Ave East Redington Neighborhood Water Main Replacement
The neighborhoods surrounding 173rd to 176th Avenues East in Redington Shores and North Redington Beach.Status: Design: In progress
Type: Utilities

2025 Pinellas County Beach Nourishment Project
The island of Sand Key, Treasure Island and Upham Beach.Status: Construction: In progress
Type: Beach and Coastal Projects

22nd Avenue S. (51st Street to 34th Street) Roadway Improvements
22nd Avenue S. (51st Street to 34th Street)Status: Construction: Completed
Type: Roadway Improvements

46th Avenue North Sidewalk Improvements (49th Street North to 37th Street North)
46th Avenue North in unincorporated Lealman from the intersection of 49th Street North to 37th Street NorthStatus: Construction: In progress
Type: Sidewalk Projects
53rd Avenue North Force Main Replacement
53rd Avenue N from Duhme Road to just east of Seminole Boulevard in unincorporated St. Petersburg.Status: Construction: Completed
Type: Utilities

54th Avenue N. Improvements
54th Avenue N., from 49th Street N. to 34th Street N.Status: Design: Not started, Study: Completed
Type: Roadway Improvements
54th Avenue North Road Force Main Replacement
54th Avenue North from the west bank of St. Joe's Creek to 74th Street North in St. Petersburg.Status: Design: In progress
Type: Utilities
60-Inch Transmission Water Main Line Valve at Keller
The project is located near the Keller Water Treatment Plant (WTP) in Tarpon Springs, within unincorporated Pinellas County.Status: Design: Completed
Type: Utilities

62nd Avenue N. Roadway Improvements (49th Street N. to 34th Street N.)
62nd Avenue N., between 49th Street N. and 34th Street N.Status: Design: In progress
Type: Roadway Improvements

62nd Avenue N. Roadway Improvements (49th Street N. to 66th Street N.)
62nd Avenue N., between 49th Street N. and 66th Street N.Status: Study: Completed, Design: On hold
Type: Roadway Improvements
62nd Street North Force Main Replacement
62nd Street North from St. Joe's Creek to 44th Avenue North, and 44th Avenue North to just east of 61st Way North in Kenneth City.Status: Construction: In progress
Type: Utilities

71st Street North Roadway Improvements
71st Street N., between 38th Avenue N. and 54th Avenue N.Status: Construction: In progress
Type: Roadway Improvements
96th Place Sewer Main Replacement
96th Place from the Pinellas Trail to Ridge Road in Seminole, Florida.Status: Design: In progress
Type: Utilities

Anclote Road Roadway and Stormwater Improvements (Anclote Blvd. to Alternate US 19)
Anclote Road from Anclote Blvd. to Alternate US 19Status: Study: Completed
Type: Roadway and Drainage Projects

Baypointe Stormwater Conservation Area
Seminole area formerly known as the Baypointe Golf CourseStatus: Design: In progress
Type: Stormwater and Drainage Projects

Bayside Health Clinic Expansion and Renovation Overview
14808 49th Street North Clearwater, FL 33762Status: Construction: Completed
Type: Facility Construction

Beckett Bridge Replacement Project
Riverside Drive/N. Spring Boulevard over Whitcomb Bayou, Tarpon SpringsStatus: Design: In progress
Type: Bridge Projects

Belcher Road at Gulf to Bay Boulevard (S.R. 60) Intersection Improvement Study
Intersection of Belcher Road and Gulf to Bay Boulevard (S.R. 60) in ClearwaterStatus: Design: Not started
Type: Intersection Improvements
Brooker Creek Preserve – Four Lakes Hammock Recreation Area
Brooker Creek PreserveStatus: Design: In progress
Type: Parks Projects
Brooker Creek Preserve Boardwalk Rehabilitation
3940 Keystone Rd, Tarpon Springs, FL 34688Status: Construction: Completed
Type: Parks Projects
Cherokee Drive Drainage Improvements
Cherokee Drive/48th Avenue N. area in unincorporated SeminoleStatus: Study: In progress
Type: Stormwater and Drainage Projects

Crystal Beach Drainage and Roadway Improvements
Crystal Beach Avenue to Florida Boulevard and St. Joseph's Sound to Avery BayouStatus: Design: In progress
Type: Roadway and Drainage Projects

Dansville Community Park
Wilcox Road, between Jackson Street and Pine StreetStatus: Construction: In progress
Type: Parks Projects
Digital Meter Upgrade
Unincorporated Pinellas CountyStatus: Implementation: In Progress
Type: Utilities
Duhme Road Force Main Replacement
Duhme Road from American Legion Drive to 53rd Avenue NorthStatus: Design: In progress
Type: Utilities

Dunedin Causeway Bridges Project
Dunedin Causeway Boulevard from Royal Stewart Arms Parkway on Honeymoon Island to the intersection of Gary Place/Gary Circle on Ward IslandStatus: Design: On hold
Type: Bridge Projects
Eagle Lake Park Rehabilitation
1800 Keene Road, LargoStatus: Construction: Completed
Type: Parks Projects

East Lake Road Corridor
East Lake Road from south of Curlew Road to north of Trinity BoulevardStatus: Study: In progress
Type: Roadway Improvements

Emergency Beach Erosion Control Project
Multiple, see mapStatus: Construction: Completed
Type: Beach and Coastal Projects

Flood Mitigation Action Plan
Multiple, see mapStatus: Study: In progress
Type: Stormwater and Drainage Projects
Flood Vulnerability Assessment
Type: Stormwater and Drainage Projects

Forest Lakes Blvd. Phase III Roadway Widening Improvements (SR 580 to SR 584/Tampa Road)
Forest Lakes Blvd. between SR 580 and SR 584/Tampa RoadStatus: Design: In progress
Type: Roadway Improvements

Fort De Soto Bay Pier Replacement
East side of Fort De Soto Park. Gulf Pier, on the west side of the park, remains openStatus: Construction: Completed
Type: Parks Projects

Fort De Soto Park Repairs and Improvements
3500 Pinellas Bayway S.Status: Design: In progress
Type: Parks Projects

Grand Canal (Dents Channel) Dredging
Dents Channel in Tierra VerdeStatus: Construction: Completed
Type: Beach and Coastal Projects
Grove Terrace & Oakdale Terrace Water Main Replacement and Relocation
Oakdale Terrace, Johnson Road, and Grove Terrace in SeminoleStatus: Construction: Completed
Type: Utilities
Gulf Beach Water Booster Station Improvements
The east side of Gulf Boulevard between 45th and 46th Avenues in St. Pete BeachStatus: Design: In progress
Type: Utilities

High Point Community Park
On the site of the former High Point Elementary SchoolStatus: Construction: In progress
Type: Parks Projects
Highland Avenue Improvements
Highland Avenue, from East Bay Drive to Belleair RoadStatus: Design: In progress
Type: Sidewalk Projects
Indian Rocks Road Improvements
Indian Rocks Road, Kent Drive to 8th Avenue SWStatus: Construction: In progress
Type: Roadway and Drainage Projects

Joe’s Creek Restoration and Greenway Trail
Main Channel of Joe's Creek from 34th Street (US-19) to 54th Avenue N.Status: Design: In progress
Type: Parks Projects
Kernwood Ct. Wastewater Force Main Upgrade
PS415 FM Modification: Force Main modification from the intersection of Knobview way and Kernwood Ct roads near PS 415 along Kernwood Ct going west and then south (Kylemont and Lynnwood neighborhoods) until the cul-de-sac and then through the utility easement up to Lansbrook Pkwy Road. PS 323 FM Modification: Force Main modification near Alderman Road and PS 323Status: Design: In progress, Construction: Not started
Type: Utilities
Keystone Road & East Lake Road Emergency Access Improvements
Intersection of East Lake Road & Keystone Road in East LakeStatus: Design: In progress, Study: Completed
Type: Intersection Improvements
Klosterman Road Force Main Replacement
The intersection of Belcher and Klosterman roads to the William E. Dunn Water Reclamation Facility on U.S. Highway Alt. 19Status: Design: In progress
Type: Utilities
Lake Tarpon Septic-to-Sewer Conversion
Three communities northeast of Lake Tarpon.Status: Design: In progress
Type: Utilities

Madeira Beach Access Parking Area
14400 Gulf Blvd, Madeira Beach, FL 33708Status: Construction: Completed
Type: Beach and Coastal Projects

Madonna Boulevard Bridge Replacement
Madonna Boulevard in Tierra VerdeStatus: Design: Completed, Construction: Not started
Type: Bridge Projects
Manufactured Housing Communities Utility System Replacement
13 manufactured home communities: 11 west and north of Lake Seminole and two near U.S. 19 and 62nd Ave N.Status: Construction: In progress
Type: Utilities

Mehlenbacher Road Sidewalk Improvements
Mehlenbacher Road, on north side from Indian Rocks Road to the Pinellas Trail, and on the south side from Indian Rocks Road to west of Dolphin Drive, Belleair BluffsStatus: Construction: Completed
Type: Sidewalk Projects

Nebraska Avenue Roadway Improvements
Nebraska Avenue, between Alternate-19 and Westlake Boulevard in Palm HarborStatus: Design: In progress
Type: Roadway Improvements

New Pinellas County Government Center
Ulmerton Road and Icot BlvdStatus: Design: In progress
Type: Facility Construction
North Pinellas County Reclaimed Water Booster Pump Station
Community: Palm Harbor - Fox Chase area Project Site: Southwest corner of the intersection of County Road 70 and Belcher Road in unincorporated Palm Harbor. See project map for details.Status: Construction: In progress
Type: Utilities

NRCS Emergency Debris Removal
Multiple, see mapStatus: Construction: In progress
Type: Stormwater and Drainage Projects
Oakhurst Shores Wastewater Pump Station Upgrade
Wastewater Pump Station 167 at the intersection of Oakhurst Dr. and Bayshore Dr.Status: Construction: In progress
Type: Utilities

Oakwood Drive Bridge Replacement
Oakwood Drive over Stephanie's Channel in Harbor Bluffs subdivisionStatus: Construction: In progress
Type: Bridge Projects

Old Coachman Road Bridge Replacement
Old Coachman Road, north of Sharkey RoadStatus: Construction: Completed
Type: Bridge Projects

Pass-a-Grille Beach Nourishment
Pass-a-Grille BeachStatus: Construction: Completed
Type: Beach and Coastal Projects
Pass-A-Grille Water Main Improvement
St. Pete Beach along Pass A Grille Way and Gulf Way from 9th Avenue to 22nd AvenueStatus: Construction: In progress
Type: Utilities

Philippe Park Improvements
2525 Philippe Parkway, Safety HarborStatus: Design: In progress
Type: Parks Projects
Pinellas Park Wastewater Collection System Upgrade
Located in Pinellas Park, Pinellas CountyStatus: Design: In progress
Type: Utilities

Pinellas Trail North Gap – Lake Tarpon Outfall Canal Bridge
Pinellas Trail, over the Lake Tarpon outfall canalStatus: Construction: Completed
Type: Trail Projects

Pinellas Trail South Gap Phase I and Phase II
Pinellas Trail from 126th Avenue N. in Pinellas Park to Haines Bayshore Road in LargoStatus: Design: In progress, Construction: In progress
Type: Trail Projects

Raymond H. Neri Community Park Improvements
4303 46th Ave. N., St. Petersburg, FL 33714Status: Construction: In progress
Type: Parks Projects

Rehabilitation of former disposal area on 119th Street N. (Future Greenspace)
12700 119th Street N., Largo, FL 33778Status: Construction: In progress
Type: Parks Projects
Ridgemoor Boulevard Bridge Replacement
Ridgemoor Boulevard in East LakeStatus: Design: In progress
Type: Bridge Projects

Riviere Road Roadway Improvements
Riviere Road between Tampa Road and Nebraska Avenue in Palm HarborStatus: Design: In progress
Type: Roadway Improvements

Roosevelt Creek Channel 5 Improvements
Roosevelt Creek Channel 5, north of Executive Drive/Old Roosevelt Boulevard and east of Evergreen Avenue in ClearwaterStatus: Construction: In progress
Type: Stormwater and Drainage Projects

Safe Routes To School
Multiple, see community-specific infoStatus: Construction: In progress
Type: Sidewalk Projects

San Martin Boulevard Bridge Replacement
Tallahassee Drive to Weedon Drive in St. PetersburgStatus: Design: In progress
Type: Bridge Projects
Sawgrass Lake Park Boardwalk & Tower Rehabilitation
7400 25th St. N., St. Petersburg, FL 33702Status: Construction: Completed
Type: Parks Projects

Shore Drive Bridge Replacement
Shore Drive in Ozona/Palm HarborStatus: Design: In progress
Type: Bridge Projects

St. Pete-Clearwater Airport Terminal Improvement
14700 Terminal Blvd., Clearwater, FL 33762Status: Design: In progress
Type: Facility Construction

Starkey Road Sidewalk Improvements (Ulmerton Road to East Bay Drive)
Starkey Road between Ulmerton Road and East Bay DriveStatus: Construction: Completed
Type: Sidewalk Projects
Subaqueous Water Main Replacement – Pass-A-Grille to Tierra Verde
Intercoastal water way between Pass-a-Grille Beach at 9th Avenue & Pass-A-Grille Way, and Pine Key at 8th Avenue North & 6th Street West.Status: Study: In progress
Type: Utilities
Submerged Water Main Upgrade- Madeira Beach to Treasure Island
29th Ave E to Key Capri, Madeira Beach to Treasure IslandStatus: Design: Not started
Type: Utilities
Submerged Water Main Upgrade, St. Pete Beach
Located in the City of St. Pete Beach, and extends to Vina Del Mar Island Neighborhood, Pinellas CountyStatus: Design: In progress
Type: Utilities

Sutherland Bayou Boat Ramp and Driveway Improvements
2119 US Highway 19 Alternate, Palm Harbor, FL 34683Status: Design: Completed
Type: Parks Projects
Taylor Lake Seawall Improvements
1100 8th Ave. SW, Largo, Florida 33770Status: Construction: Completed
Type: Parks Projects
Vina Del Mar Neighborhood, St Pete Beach Water Main Improvements
Located in the Vina Del Mar Island neighborhood of St. Pete Beach, Pinellas County.Status: Design: In progress
Type: Utilities
Water Main Upgrade Project-133rd Ave N to 126th Ave N, Largo
133rd to 126th Ave N Neighborhood, Largo, Pinellas CountyStatus: Design: In progress
Type: Utilities
Weedon Island Boardwalk and Pier Rehabilitation
Weedon Island PreserveStatus: Construction: Completed
Type: Parks Projects

Weedon Island Preserve Salt Marsh Restoration
Weedon Island PreserveStatus: Construction: Completed
Type: Parks Projects

West Bay Drive Improvements
West Bay Drive from Belleair Bridge in the City of Belleair Bluffs to the intersection of Clearwater-Largo Road in the City of LargoStatus: Design: In progress
Type: Roadway Improvements

Westwinds and Crosswinds Bridges Project
Westwinds Drive over the Westwinds Canal and Crosswinds Drive over the Crosswinds Canal in Palm Harbor.Status: Construction: Completed
Type: Bridge Projects

Whitney Road and Wolford Road Intersection and Roadway Improvements
The intersection of Whitney Road and Wolford Road, and surrounding area.Status: Construction: In progress
Type: Intersection Improvements
Whitney Road Complete Streets Project
Whitney Road from US 19 to Bolesta RoadStatus: Study: Completed